812501
64
Zoom out
Zoom in
Previous page
1/68
Next page
W
W
62
10-LOADING THE PELLETS
LOADING THE PELLETS
Fuel is loaded from the upper part of the stove by lifting door “W”.
Pour the pellets in slowly so that they are deposited at the bottom of the hopper.
If loading pellets when the stove is running, open the door of the tank using the cold handle that comes with the
stove itself.
When loading, do not let the pellet bag come into contact with hot surfaces.
Never remove the protection grid inside the hopper.
No other type of fuel other than pellets is to be inserted into the hopper, in compliance with above-mentioned
specications. Store the spare fuel at an adequate safe distance.
Do not pour pellets directly onto the brazier but only into the hopper.
When the appliance is running and when it is turned o, most of the stove surfaces are very hot (door, handle, glass,
smoke outlet pipes, etc.). Therefore it is recommended to avoid coming into contact with these parts.
SUITE/CLUB STOVE
MUSA STOVE
64


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for MCZ MUSA AIR 10 M2 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of MCZ MUSA AIR 10 M2 in the language / languages: English as an attachment in your email.

The manual is 8.56 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of MCZ MUSA AIR 10 M2

MCZ MUSA AIR 10 M2 User Manual - English - 72 pages

MCZ MUSA AIR 10 M2 User Manual - German - 72 pages

MCZ MUSA AIR 10 M2 Installation Guide - German - 68 pages

MCZ MUSA AIR 10 M2 User Manual - Dutch - 72 pages

MCZ MUSA AIR 10 M2 Installation Guide - Dutch - 68 pages

MCZ MUSA AIR 10 M2 User Manual - French - 72 pages

MCZ MUSA AIR 10 M2 Installation Guide - French - 76 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info