632414
12
Zoom out
Zoom in
Previous page
1/57
Next page
PELLET STOVES Chapter 2
INSTALLATION AND USE MANUAL
page 12
Theoretical notion for installation Technical service - Rights reserved MCZ GROUP S.p.A. - Reproduction prohibited
2.3. OPERATING AREA
For proper functioning and a good temperature distribution, the stove
should be positioned in a location where it is able to take in the air
necessary for combustion of the pellets (about 40 m
3
/h must be
available), as laid down in the standard governing the installation and
in accordance with local national standards.
The volume of the room must not be less than 30 m
3.
The air must come in through permanent openings made in walls (in
proximity to the stove) which give onto the outside, with a minimum
cross-section area of 100 cm
2.
These openings must be made in such a way that it is not possible for
them to be obstructed in any way.
Alternatively, the air can be taken from rooms adjacent to the one
which needs ventilating, as long as they are provided with an air intake
from the outside, and are not used as bedrooms or bathrooms, and
provided there is no fire risk such as there is for example in garages,
woodsheds, and storerooms, with particular reference to what is laid
down in current standards.
It is not permissible to install the stove in bedrooms,
bathrooms, or in a room where another heating
appliance is installed (fireplace, stove etc.) which
does not have its own independent air intake.
Locating the stove in a room with an explosive
atmosphere is prohibited.
The floor of the room where the stove is to be
installed must be strong enough to take its weight.
In the case of flammable walls, keep a minimum distance to the rear
(A) of 5 cm, to the side (B) 5 cm, a minimum distance from the tube
to the wall (E) of 5 cm and to the front 150 cm.
If the room contains objects which are believed to be particularly
delicate, such as drapes, sofas and other furniture, their distance from
the stove should be considerably increased.
If the flooring is made of wood, provide a floor
protection surface in compliance with current
national standards.
2.4. CONNECTION TO THE EXTERNAL AIR INTAKE
It is essential that at least as much air must be able to flow into the
room where the stove is installed as is required for proper combustion
in the appliance and for the ventilation of the room. This can be
effected by means of permanent openings in the walls of the room to
be ventilated, which give onto the outside, or by single or collective
ventilation ducts.
For this purpose, on the external wall near the stove, a hole must be
made with a minimum free cross-section of 100 cm². (equivalent to a
round hole of 12 cm diameter or a square hole 10x10 cm), protected by
a grille on the inside and the outside.
The air intake must also:
communicate directly with the room where the stove is installed
Example of pellet stove installation
Example of pellet stove installation
Downloaded from www.Manualslib.com manuals search engine
12


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for MCZ KAIKA Air at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of MCZ KAIKA Air in the language / languages: English as an attachment in your email.

The manual is 2,87 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of MCZ KAIKA Air

MCZ KAIKA Air Usermanual and installation guide - Dutch - 58 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info