PELLET STOVES Chapter 3
INSTALLATION AND USE MANUAL
page 23
Installation and assembly Technical service - Rights reserved MCZ GROUP S.p.A. - Reproduction prohibited
3.2. PREPARATION AND UNPACK ING
STAR and EGO stoves are delivered with two different packagings:
The EGO and MUSA stove has one packaging
o It contains the stove and the steel sides with the
profiles (Fig.1)
The STAR stove has two packagings
o One contains the stove and the profile for the ceramic
or the soapstone
o One contains the ceramic (fig.2). In this case there will
be a single packaging for the structure (the cardboard
with the ceramics will be placed above the packaging
with the structure)
o or Soapstone (fig.3) (in this case there are two
packagings structure + soapstone pallet)
SUITE and CLUB stoves are delivered in two packages placed
on top of each other:
o the first contains the stove
o The second contains the ceramic cladding. (Fig. 2)
EGO/STAR and MUSA stoves
Open the packaging, remove the four screws that secure the base of
the stove to the pallet, two to the right and two to the left (see figure
4), and position the stove in the selected place, ensuring that it is
complies with the above instructions.
Figure 1 – Example of packaging stove
+ steel sides (Ego stove)
Figure 3 - Example of soapstone
packaging
Figure 4 - Removing packaging screws (in
fi