785603
115
Zoom out
Zoom in
Previous page
1/120
Next page
IT / AC Power Analyser / febbraio 2011 115
INSTALLATION

alimentazione CA come segue:
1 Montare l’analizzatore di alimentazione CA a parete
usando lo schema delle dimensioni per praticare i
fori.
2 Collegare i cavi MasterBus e il display MasterBus.


ciascun segnale.
123456
Common
Switch On
LED On
LED Fail
NC
NC
COMUNE
ACCENDERE
LED ATTIVO
GUASTO LED
Figura 11: Connettore RJ 12 con segnali pin
4 Montare la bobina di corrente in un punto protetto e
isolato quanto più possibile vicino alla distribuzione
CA:
5 Far passare la linea di fase (L) dell’installazione CA
attraverso la bobina di corrente.


7 Integrare un fusibile appropriato al cablaggio, in


coperchio, incluso nella confezione.
8 Opzionale : collegare un relè bistabile corrente

punto 3)
9 Eseguire l’impostazione primaria usando il display
MasterBus o un PC.
AVVERTENZA

siano sempre collegati quando l’impianto
elettrico è in funzione. Altrimenti può essere

AVVERTENZA
Pericoloso toccare i cavi CA sotto tensione!
Usare sempre l’accluso spinotto CA con
coperchio per prevenire ciò!
7.3 ALIMENTAZIONE MASTERBUS
Almeno un dispositivo MasterBus su tre deve
star alimentando MasterBus. Se CA è disponibile

alimentazione CA sta alimentando MasterBus .
7.4 MESSA IN SERVIZIO
Controllare che tutto il cablaggio sia OK. Poi:
(Ri)collegare l’ingresso dell’analizzatore di
alimentazione CA.
115


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Mastervolt AC Power Analyser at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Mastervolt AC Power Analyser in the language / languages: English, German, Dutch, French, Italian, Spanish as an attachment in your email.

The manual is 6.99 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info