GB GB
English Page 83
L. Index of illustrations
Fig. D.1: Required tools
Fig. D.2: Site requirements
Fig. D.3: Push on adapter sleeve
Fig. D.4: Turn operator unit
Fig. D.5: Boom on operator
Fig. D.6: Screw boom to operator
Fig. D.7: Mount suspension clamp
Fig. D.8: Mount securing sleeve
Fig. D.9: Lintel joining plate
at the boom end piece
Fig. D.10: Release pin out of carriage
Fig. D.11: Release pin inside carriage
Fig. D.12: Release the carriage
Fig. D.13: Operator with up-and-over
door
Fig. D.14: Operator with sectional door
Fig. D.15: Operator with heavy sectional
door
Fig. D.16: Operator with retractable
up-and-over door
Fig. D.17: Fixing angle for adapter arm
Fig. D.18: Adapter arm at the door
Fig. D.19: Measurements of adapter arm
Fig. D.20: Suspension of operator system
Fig. D.21: Installation of bulb
Fig. D.22: Separate door from operator - 1
Fig. D.23: Separate door from operator - 2
Fig. D.24: Connect door with operator
Fig. E.1: Hand transmitter
Fig. E.2: Open hand transmitter /
Insert battery
Fig. E.3: Attachment clip
for hand transmitter
Fig. E.4: Learn hand transmitter coding
Fig. E.5: Change hand transmitter
coding
Fig. F.1: Electronic aerial
Fig. F.2: Connection of external control
elements
Fig. F.3: Details external control elements
Fig. G.1: Summary on electronic control
unit
Fig. G.2: Remove cover
Fig. G.3: Replace cover
Fig. G.4: Cabling plan
Comfort 250, 252
Fig. G.5: Wiring diagram
Comfort 250, 252
Fig. O.1: Supply package - 1
Comfort 250, 252
Fig. O.2: Supply package - 2
Comfort 250
Fig. O.3: Supply package - 2
Comfort 252