English Page 14
D. Installation
Installation of the bulb
12
• Turn in a bulb E14 (max. 40 W).
• Clip in the lamp cover.
• Turn in the securing screw.
After given impulse the bulb is on for approx. 3 min.
Attention!
Please disconnect by all means the unit from power supply
before you change the bulb.
While lowering the boom and by extending the linking bar the door opening
is enlarged. The linking bar may only be extended so far that the inner pressure
rolls (H) do not touch the fixing screws (I).
Suspension of the operator system
Suspension of motor unit
• Fix 1 support plate (A) above the motor unit (see as well point 3).
• Bend the plate according to site requirements.
Suspension of boom
• Push 1 support plate (A) through suspension clamp (B) and bend projecting
parts.
• Positioning of the suspension of boom (see as well point 3).
11