Thank you for choosing Lofrans. The Project 1000 is the new Lofrans windlass , designed for boat from 10 (29’) up to 14 mts (45’) length . Listed below are the technical features :
•Chromed Bronze finish as standard
•Nominal power with S2 parameter 11 minutes : 1000W 12V or 1000W 24V
•Peak power with S2 parameter 1 minute : 1500W 12V or 1500W 24V
•Electric motor waterproof IP 66 degree with faster payout speed for lowering of the
anchor.
•Nickeled chain gipsy
•Rope and chain management with 8 mm -5/16”HT - 5/16”BBB chain and diameter
18mm – 5/8” rope
•Cone clutches equipped
•Main shaft in stainless steel AISI 431
•Base bearing in stainless steel AISI 440
•Independent drum from gipsy
•Manual override equipped
•Haulage speed : from 16 up to 25 mt/min
•Lowering speed by electric motor : 45 mt/min
•Ampere load : from 70 - 110 A (12V) , from 40 – 60 A (24V)
•Max pull measured with dynamometer : Kgs 900 approx
•Weight : Kgs 19
SAFETY INFORMATION
•This product is not designed as a strong point to fasten your anchor rode. Fast the anchor rode to a strong point such as mooring cleat or similar.
•The vessel’s engine should always be running and used to assist in the recovery of the ground tackle.
•Always install the properly rated circuit breaker to protect the electric circuit and the motor from overheating and damage.
•Always turn off the main switch when the windlass is not in use to prevent accidental engagement.
•Always keep hands and feet clear of an operating windlass.If a jam occurs turn the windlass off at the main switch before clearing the anchor rode.
•Do not use the windlass for different purposes it was designed for.
WINDLASS WIRING MINIMUM REQUIREMENTS
Below there are the requirements for all the components of the windlass electric plant depending from the motor nominal power .
1000 W 12V 1000 W 24V
A-Battery capacity 200 Ah 100 Ah
B-Power cables size 50 mm² - 1 AWG 35 mm² - 2 AWG
C-Lofrans Circuit breaker (slow time/current curve) 100 A 70 A
A.Battery of lower capacity decrease the windlass performances and are rapidly subjected to wear and tear.
B.This size must be increased when the length of the positive plus the negative cables are more than 25 mts. Use marine grade tinned copper wire.
C.The Lofrans circuit breaker protects the power line from short circuit and the windlass motor in case of overheating. It must be kept dry and installed in accessible place to be
prompty reactivated when it trips. It can be also used to isolate the windlass from the remote controls as we strongly suggest to avoid accidental engagement.
All the switches must be wired in parallel.We strongly recommend to have a minimum of two switches to operate the windlass in case one of them gets damage.
All Lofrans equipment is CE approved.
INSTALLATION GENERAL REQUIREMENTS
Proper installation of the windlass is critical and these essential conditions listed below need be fully satisfied :
Fig.1 The gipsy of the windlass must be in line with the bow roller.
Fig.2 The deck must be flat. The structure of the boat must be adeguate to the load that the windlass is able to pull. If necessary reinforce the deck with a backing pad to spread the
stress.
Fig.3 When determining the position of the windlass , it is critical to locate it directly above the deepest area of the chain locker. As the chain falls into the chain locker , it must be
maximized because when the chain is stored. The chain tends to gather in the shape of a pyramid , which reduce the available space. If the chain pyramid falls , then overlaps
may occur, resulting in jams. The deeper the locker , the less likely this will occur. You must have a minimum of A=12” between the underside of the deck and the top of the
heaped chain. The chain locker shape is really important to limit the pyramid problem. The chain coming from the bow roller can be inclinated up to 5 degrees.
INSTALLATION PROCEDURE
Fig.4 Carefully position the template provided to the deck . Mark and drill the holes as indicated (see Fig.A). The forward , leading edge of the chain hole should be dressed with a
45° degree angle. A drum rasp or Dremil Tool™ will be helpful. Sand smooth all edges and seal (see Fig.B). Cleand the deck area and position the deck gasket supplied.
Fig.5 Loosen the 4 hex nuts (227) to separate the topworks from the gearbox and motor. Position the topworks the deck aligning the gasket properly. The gearbox flange provides
keyhole assistance. Screw 2 washer,lock washer and nuts to the end of two opposing mounting studs (see Fig.C).
Fig.6 Join the gearbox to the windlass topworks by inserting the key (284) of the main shaft into the key way of the gearbox. Align the motor away from the chain pipe and rotate the
gearbox to allow the 2 nuts to assist in supporting the weight of the lower unit (motor and gearbox). See Fig.D.
Fig.7 Fasten a washer ,lock washer and hex nut to the remaining deck studs. Tighten all hardware properly. Connect the cables from the battery to the electric motor as shown in the
electric diagram.
TEST PROCEDURE
ATTENTION ! DO NOT OPERATE THE WINDLASS WITHOUT THE ROPE-CHAIN INTO THE GIPSY TO AVOID TO DAMAGE THE PART 905 (FINGER)
Fig.8 Introduce the rope-chain into the gipsy . Please take care to keep hands and feet away of the incoming rope-chain.
Fig.9 Turn on the remote control. Operate the UP switch. The chain will be recovered. Release the UP switch.Operate the DOWN switch. The chain will be released. If the windlass
runs in wrong direction change over the UP and DOWN wires at the control box.
Fig.10 After using the windlass , we strongly recommend that the nuts are checked again to ensure they are well tightened.
Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.
Product:
Forumrules
To achieve meaningful questions, we apply the following rules:
First, read the manual;
Check if your question has been asked previously;
Try to ask your question as clearly as possible;
Did you already try to solve the problem? Please mention this;
Is your problem solved by a visitor then let him/her know in this forum;
To give a response to a question or answer, do not use this form but click on the button 'reply to this question';
Your question will be posted here and emailed to our subscribers. Therefore, avoid filling in personal details.
Register
Register getting emails for Lofrans Project 1000 at:
new questions and answers
new manuals
You will receive an email to register for one or both of the options.
Get your user manual by e-mail
Enter your email address to receive the manual of Lofrans Project 1000 in the language / languages: English, German, French, Italian, Spanish as an attachment in your email.
The manual is 1,33 mb in size.
You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.
The manual is sent by email. Check your email
If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.
The email address you have provided is not correct.
Please check the email address and correct it.
Your question is posted on this page
Would you like to receive an email when new answers and questions are posted? Please enter your email address.