6.2 P
REVENTIVE MAINTENANCE SCHEDULE
Follow the schedule below to ensure proper operation of the product.
ITEM WEEKLY MONTHLY QUARTERLY BI-ANNUAL ANNUAL
DISPLAY CONSOLE ASSEMBLY
Hardware Inspect
Overlay Clean Inspect
Accessory Cups Clean Inspect
Stop Switch Clean Inspect
Emergency Clean Inspect
Switch/Magnet
HANDLEBAR ASSEMBLY
Hardware Inspect
Ergo
TM
Front Handlebar Clean Inspect
Side Hand Rails Clean Inspect
Lifepulse Sensors Clean/Inspect
FRAME ASSEMBLY
Hardware Inspect
Motor Cover Clean
Motor Electronic Vacuum Clean Inspect
Compartment
Drive Belt Inspect
Drive Belt Anti-Static Inspect
Bracket
Anti-Static Inspect
Cords
Leg Levelers Inspect/Adjust
Front Roller Inspect
Rear Roller Inspect
Side Step Area Clean Inspect
GENERAL
Machine Level *Inspect
Striding Belt Inspect
Centered
Frame, Toe Guards, Visual Inspect
Endcaps
Tinsel Visually Inspect if Treadmill has been Moved
Replace Tinsel if Changing Belt and Deck
*Use bubble level to inspect
41