696303
24
Zoom out
Zoom in
Previous page
1/96
Next page
ENGLISH
The following features are FORBIDDEN and therefore they endanger the good operation of the device: asbestos cement, galvanized steel,
rough and porous internal surfaces. In Picture 3 gives some examples of execution.
For a correct installation please respect the sections/lengths of the ue shown in the technical data table. By installations
with dierent dimensions the ue must be suitably sized in accordance with EN13384-1.
The draught created by the ue must be sucient, but not excessive.
A too big ue section can feature a too big volume to be heated and consequently cause diculties in the operation of the device; to avoid
this, tube the ue along its whole height. A too small section causes a decrease of the draught.
ATTENTION: as far as concern the realisation of the ue connection and ammable materials please follow the requirements
provided by UNI 10683 standard. The ue must be properly spaced from any ammable materials or fuels through a proper
insulation or an air cavity.
It is FORBIDDEN to let plant piping or air feeding channels pass in the same ue. Moreover, it is forbidden to create movable or
xed openings on the same for the connection of further other devices (Picture 4).
CHIMNEY CAP
The draught of the ue depends also on the suitability of the chimney cap.
Therefore, if it is handicraft constructed, the output section must be more than twice as big as the internal section of the ue (Picture 5).
Should it be necessary to exceed the ridge of the roof, the chimney cap must assure the discharge also in case of windy weather (Picture 6).
The chimney cap must meet the following requirements:
have internal section equivalent to that of the stack.
have a useful output section twice as big as the ue internal one.
be manufactured in such a way as to prevent the penetration of rain, snow, and any other foreign body in the ue.
be easily checkable, for any possible maintenance and cleaning operation
CONNECTION TO THE FLUE
The connection to the stack must be performed with sti pipes in steel comply with all current Standards and Regulations and to those
envisioned by the Law.
It is FORBIDDEN to use metallic pipes or pipes in asbestos cement since they jeopardize the safety of the tting itself,
considering that they are subject to tears or breaks resulting in leaks of smoke.
The exhaust pipe must be air-tight fastened to the stack and can have a maximum inclination of 45°; this to avoid excessive deposits of
condensate produced in the initial start-up phases and/or the excessive gripping of soot and moreover it avoids the slowing down of the
smokes at output.
The failed tightness of the connection can cause the malfunction of the device.
The internal diameter of the connection pipe must be equal to the external diameter of the smokes stub pipe of the device. This is assured
by the pipes complying with DIN 1298.
The chimney pressure (DRAUGHT) must be at least (see chap. TECHNICAL DATA SHEET) . The measurement has always to be carried out
with hot device (rated thermal performance).
When the depression exceeds 17 Pascal (=1.7 mm of column of water), it is necessary to reduce the same by installing an additional draught
regulator (buttery valve).
IMPORTANT: When using metallic pipes, they must be insulated with proper materials (coatings in insulating bers resistant
up to 600°C) in order to avoid deterioration of walls or of the counter-hood.
Before positioning the insert in the pre-existing replace, it is necessary to close the upper internal part of the stack using (properly pre-
drilled) sheet metal or any other kind of re-resistant material that can support very high temperatures without suering any damage. (see
Picture 7 pos. 1 Inserti - Picture 13).
AIR FOR COMBUSTION
It is necessary to ventilate continuously the space included between the upper part, the sides of the device and the deector of the re-
proong material of the hood.
For this reason, it is necessary to foresee an intake of air from the bottom (intake of fresh air) and a high output (output of hot air).
Each of these openings must be free and it should not be possible to obstruct it; moreover, they must have a minimum surface of at least 3
dm
2
(example: 30 x 10 cm grating).
In this way, the following targets are achieved:
a greater safety
an increase of the heat created by air circulation around the device.
a better working of the appliance
The heat vent grating (Picture 7 pos. 6 - Picture 13) has to be installed on the upper part of the hood at about 20 cm from the
roof. This must always be installed since its function is that of letting the heat collected within the hood (overpressure) ow out into
the room.
24
24


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for La Nordica Inserto Crystal 80 PRS at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of La Nordica Inserto Crystal 80 PRS in the language / languages: English, German, French, Italian, Spanish as an attachment in your email.

The manual is 9,32 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info