7
Assembly Instructions
GB
nual work. Therefore please be careful when assembling this machine.
■ Ensure that your working area is free of possible sources of danger, for example don’t lea-
ve any tools lying around. Always dispose packaging material in such a way that it may not
cause any danger. There is always a risk of suffocation if children play with plastic bags!
■ Bolt all the parts together loosely at first, and check that they have been assembled cor-
rectly. Tighten the locknuts by hand until resistance is felt, then use spanner to finally tigh-
ten nuts completely against resistance (locking device). Then check that all screw connec-
tions have been tightened firmly. Attention: once locknuts have been unscrewed they no
longer function correctly (the locking device is destroyed), and must be replaced.
■ For technical reasons, we reserve the right to carry out preliminary assembly work (e.g.
addition of tubing plugs).
List of spare parts
When ordering spare parts, always state the full item number, spare-partnumber, the quan-
tity required and the S/N of the product (see spare parts drawing).
Example order: item no. 08395-370 / spare-part no. 70130196 / 2 pieces / S/N......
Important: spare part prices do not include fastening material; if fastening material (bolts,
nuts, washers etc.) is required, this should be clearly stated on the order by adding the words
„with fastening material“.
Please keep original packaging of this article, so that it may be used for transport at a later
date, if necessary. Goods may only be returned after prior arrangement and in (internal)
packaging, which is safe for transportation, in the original box if possible. It is important to
provide a detailed defect description / damage report!
KETTLER GB Ltd.
KETTLER House, Merse Road · North Moons Moat · Redditch, Worcestershire B98 9HL
KETTLER International Inc.
1355 London Bridge Road · Virginia Beach, VA 23453
http://www.kettler.de