771453
11
Zoom out
Zoom in
Previous page
1/20
Next page
I&O manual
9
Preliminary checks before startup Check for the presence of air in the water system.
Before starting up the unit, make sure that:
the unit is positioned correctly;
the flow and return pipes of the water system are correctly
connected;
the pipes are clean and free of air;
the unit falls correctly towards the drainage outlet and the
trap;
the heat-exchangers are clean;
the electrical connections are correct;
the screws holding the cables are well tightened;
the supply voltage is as required;
the power consumption of the blower is correct and does not
exceed the maximum permitted.
3.2.4 Maintenance
1 remove the casing of the machine (on units I and II );
2 start the system and run for a few minutes;
3 stop the system;
4 slacken the bleed screw on the inlet manifold and
bleed the air.
5 Repeat the operation several times until no more air
comes out of the system.
At the end of the season
Drain the water system (for all heat exchangers).
To avoid the risk of rupture due to freezing, it is
advisable to drain the water from the system at the
end of every season.
Electrical Circuit
The following operations are recommended for the
maintenance of the electrical circuit:
DANGER!
CAUTION
1 check the unit 's power absorption using a clip-on
ammeter and compare the reading with the values
shown on the documentation;
Maintenance work must only be carried out by qualified
technicians authorized to work on air-conditioning and
refrigeration systems. Use suitable work gloves.
Do not introduce pointed objects through the air intake grilles.
Disconnect the power supply before cleaning and maintenance.
Use dry cloth to clean the unit.
Always disconnect the unit from the mains power supply at
the main isolator switch before carrying out maintenance
work or checks. Make sure that no one accidentally supplies
power to the machine, lock the main switch in the Off
position.
SCHEDULED MAINTENANCE
Once a month
Check the state of cleanliness of the air filters.
The air filters are made of fiber and are washable in
water. The state of cleanliness of the filters must be
checked regularly at the start of the operating season and
monthly.
Every six months
Check the state of cleanliness of the heat-exchanger and
the condensation drain-tube. With the unit switched off,
remove the casing of the machine and check the state of
the heat-exchanger and the condensation drain-tube. If
necessary:
2 inspect and, if necessary, tighten the electrical
contacts and terminals.
NON-SCHEDULED MAINTENANCE
Replacement of the blower assembly
In the case of burnout of the blower electric
motor, it is necessary to replace the entire blower
assembly.
Procedure for removal of the blower:
1 Remove the casing (on units I and II)
2 Disconnect the electrical supply cable from the
blower;
3 Remove the screws on both sides which hold the
blower to the structure of the unit;
4 Take out the blower.
1 remove any foreign bodies from the finned surface
which may obstruct air flow;
2 clean off the dust with a jet of compressed air;
wash and brush, gently, with water;
3 dry with a jet of compressed air;
4 check that there are no obstructions in the
condensation drain tube which could prevent the
normal flow of water.
Fig.3-11
5 Procedure for refitting the blower is a reversal of the
above.
11


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Kaysun KFC-S-2T-250D at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Kaysun KFC-S-2T-250D in the language / languages: English as an attachment in your email.

The manual is 1.88 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info