9 - START-UP
The following check list is a brief reminder of the points to check and of the operations to perform to start-up the unit.
For details refer to the various chapters in the manual.
9.3 - PRELIMINARY CHECKS
Before starting the unit, make sure that the room is free of dust and debris and that the conduits are not
blocked
Preliminary checks
1 The flooring beneath the unit must be able to support the weight of the unit when filled with water (more than 287kg,
model 190 – more than 310kg, model 190S) - (more than 412kg, model 300 - more than 435kg, model 300S)
2 Located indoors (such as a basement or garage) and in a vertical position. Sheltered from freezing temperatures.
3 Drain pan installed and piped to an adequate drain.
4 Sufficient room to maintenance the unit.
5 Sufficient air for the heat pump to function, the unit must be located in a space >15m³, and must have unrestricted air
flow.
6 The unit cannot be placed into any type of closet or small enclosure.
7
The site location must be free from any corrosive elements in the atmosphere such as sulfur, fluorine, and chlorine.
These elements are found in aerosol sprays, detergents, bleaches, cleaning solvents, air fresheners, paint, and varnish
removers, refrigerants, and many other commercial and household products. In addition excessive dust and lint may
affect the operation of the unit and require more frequent cleaning.
8 The externalair temperature must be above -7ºC and below 43ºC. If the externalair temperature falls outside these
upper and lower limits the electrical elements will be activated to meet the hot water demand.
9 DHW safety valve properly installed with a discharge pipe run to an adequate drain and sheltered from freezing.
10 Filter for water coming from water mains present and accessible for maintenance
11 Water temperature limit valve or mixer tap (recommended) installed per manufacturer’s instructions.
12 All piping properly installed and free of leaks.
The indicated operations should be done by qualified technician with specific training on the product.
Upon request, the service centres performing the start-up.
The electrical, water connections and the other system works are by the installer.
Agree upon in advance the star-up data with the service centre.
Before checking, please verify the following:
the unit should be installed properly and in conformity with this manual
the electrical power supply line should be isolated at the beginning
the unit isolator is open, locked and equipped with the suitable warning
make sure no tension is present
After turning off the power, wait at least 5 minutes before accessing to the electrical panel or any other electrical component.
Before accessing check with a multimeter that there are no residual stresses.
9.2 - GENERAL
32


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Kaysun COMPAK KHPA at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Kaysun COMPAK KHPA in the language / languages: English as an attachment in your email.

The manual is 14.06 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info