669620
22
Zoom out
Zoom in
Previous page
1/36
Next page
22
5 – FIRST USE OR REUSE
Follow carefully the instructions before using the machine.
• open the external packing and take the machine out. Inspect the
machine to ascertain that it is intact and in good condition. Check
for the presence of all the accessories supplied with the machine
(see paragraph 4)
• position the machine on a flat surface
• remove the cover and take out the water tank (2) (located inside
the machine) and rinse it
• fill the container with clean water, return it to its housing and
insert the silicon tubes. Close the cover on the machine
WARNING ! Before making the electric connection,
make sure that the main power voltage corresponds
to the specifications indicated on the data plate placed
under the base of the machine.
Press the main power switch (1); the pilot light (14) will be
switched on.
The automatic level indicator will start filling the boiler with water
until it automatically reaches the prescribed level; the boiler water
level is automatically checked and the prescribed level will be
automatically refilled.
Then wait until the machine reaches the 1.1 – 1.3 bar operating
pressure, by checking the boiler pressure on the pressure gauge
(2) MONDIALE E MONDIALE PID.
The machines with the termopid (18) will visualize the degrees
inside the boiler and will control the boiler’s heating.
The termopid is already set from the producer on 122°c (about
1,2 bar), the ideal temperature for a good cup of coffee. (If you
want to change the pid’s temperature, please follow the instructions
written under how to set the temperature inside the boiler by means
of the pid).
When the display of termopid see the set temperature and then
and 'the pressure has been reached, the machine' ready for use.
The machine with a basin built-in is provided with a safety device
controlling the amount of water contained in the basin itself; when
the water level reaches a capacity of approximately 0.5 litres, the
device automatically stops all the machine functions.
The red warning light (15), located on the user side of the panel,
switches on to indicate that the water is missing in the water tank.
As it is filled up, the warning light switches off and the machine is
ready again to deliver coffee.
Fill the filter holder (12) with the brewing group (11)
Thanks to the working of the lever group (20), brew some water to
avoid the correct refilling of the coffee exchanger.
WARNING ! The coffee brewing and the power supply
of the heating element don’t work when the water
tank lamp (15) is on.
During start-up: when the boiler pressure gauge (5) shows a
pressure of approximately 0.5 bar, open slowly the steam tap
handle (7), to discharge the air contained in the boiler, and wait
until steam starts flowing out of the steam supply nozzle (10), then
close it.
Wait for the reaching of the pressure and the correct thermic balan-
ce, after 10 – 15 minutes.
5.1 – ZAFFIRO MODEL
Switch on the machine setting the switch on/off (1) on the position
“I”. The lighting of the lamp (14) confirms the electric feeding.
Fill the filter holder (12) with the brewing group (11).
Put a tank under the water/steam jet (24).
Open the hot water/steam handle (23). Put the lever to supply hot
water (21) on the position “I”.
When the water comes out from the steam jet spout, put the switch
lever to supply hot water (21) on the position “O” and close the
handle(23). These operations are useful to effect the right refilling
of the boiler.
e) Using the lever of the brewing group (20) make a water supply
to avoid the right refilling of the coffee circuit.
WARNING ! The coffee supply and the heating feeding
don’t work when the water tank lamp (15) is on.
The machine with a basin built-in is provided with a safety device
controlling the amount of water contained in the basin itself; when
the water level reaches a capacity of approximately 0.5 litres, the
device automatically stops all the machine functions.
The red warning light (15), located on the user side of the panel,
switches on to indicate that the water is missing in the water tank.
As it is filled up, the warning light switches off and the machine is
ready again to deliver coffee.
To ensure proper operation of the safety device, avoid placing
cups or other items on the tank lid (2).
N.B. : the warning light of the reaching of the right
temperature will continue to go out and to light up
automatically during the heating period.
After doing these operations, wait that the machine builds up the
operating temperature to make coffee, lamp (17) off.
5.2 PRESSURE SWITCH REGULATION (ONLY KIA MODEL)
The pressure switch shown in the picture has to keep the pressure
in the boiler constant, by activating or deactivating the electrical
heating element.
This pressure switch is adjusted during the final testing of the
machine on a 1.1÷1.3 bar value; however, if the specific case
requires a different operating pressure, the pressure switch ope-
rating range can be changed by operating on the regulation
screw (U): by reducing the pressure, you will obtain a temperature
reduction, by increasing the pressure, the water temperature also
increases.
The regulation sense is shown in the picture and also on the pres-
sure switch itself. The pressure changes approximately 0.1 atm for
each complete turn of the screw.
22


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Isomac Mondiale PID at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Isomac Mondiale PID in the language / languages: English, German, Italian as an attachment in your email.

The manual is 1,49 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info