477554
25
Zoom out
Zoom in
Previous page
1/208
Next page
Maintenance
Daily Weekly
Maintenance interval in
hours
25 100 200 400 800
Do a check of the parking brake X
Adjust the parking brake * *
Do a check of the lamps, replace broken lamps X
Lubricate according to the lubrication overview X X X
Lubricate the blade shafts X
Lubricate the front and rear bearings of the lift arms X X
Lubricate the pivot wheel bearings X
Lubricate the drive shaft X X X
Lubricate the throttle cable X
Lubricate the wheel axles splines X
Examine and adjust the wheel nuts * *
Make sure that the tire pressure is correct X X X
Replace the blades X X
Replace the engine oil
1
X
Replace the oil filter
1
X
Replace the oil in the angle gear *
Replace the hydraulic oil *
Replace the hydraulic oil filter *
Replace the air filter X
Replace the fuel filter X
Do a check of the parallelism of the cutting deck X X
Replace the generator belt *
Replace the PTO belts *
Replace the coolant *
Examine the battery X X X
Make sure that the muffler is attached correctly and not dam-
aged
* * *
Replace the engine cushions and the gear cushions *
Do a check of/adjust front and rear wheel speed * *
Do a check of the oil level in the bevel gear X X
Replace the oil in the bevel gear *
Replace the oil in the transmissions * *
1
Replace first time after 25 hours. For heavy load operation or at high ambient temperatures, replace every 50
hours.
740 - 004 - 25
25


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Husqvarna P525D at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Husqvarna P525D in the language / languages: English, Italian, Portuguese, Spanish as an attachment in your email.

The manual is 18,88 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Husqvarna P525D

Husqvarna P525D User Manual - German - 208 pages

Husqvarna P525D User Manual - German - 56 pages

Husqvarna P525D User Manual - Dutch - 208 pages

Husqvarna P525D User Manual - Dutch - 56 pages

Husqvarna P525D User Manual - French - 208 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info