771626
6
Zoom out
Zoom in
Previous page
1/27
Next page
1) Fixation
The support of the outdoor unit shall be fixed onto the wall surface, and then the outdoor unit shall be fixed onto
the support horizontally. In case the outdoor unit is wall-mounted or roof-mounted, the support shall be firmly
fixed, to avoid the damage of strong wind.
2) Installation of connecting pipes
The cone of the connecting pipes shall be aligned with the conical surface of corresponding valve connector.
The nut of connecting pipes shall be installed at a proper position and then be tightened with a spanner. Excessive
tightening torque shall be avoided, or otherwise the nut may be damaged.
Vacuumizing
A digital vacuum gauge shall be connected for vacuumizing. The duration of vacuumizing shall be at least 15
minutes, and the pressure of the vacuum gauge shall be below 60Pa.Afterwards, the vacuumizing equipment shall
be closed, and whether the reading of the digital vacuum gauge is increased or not shall be observed after the
pressure is maintained for 5 minutes. In case no leakage is identified, the two-way stop valve and three-way stop
valve of the outdoor unit may be opened. Finally, the vacuumizing hose connected to the outdoor unit can be
disassembled.
Leak Detection
The joint of connecting pipes for the outdoor unit shall be subject to leak detection with soap bubble or
dedicated leak detection equipment.
Post-installation Inspection Items and Test Run
Post-installation Inspection Items
qesnoC dekcehC eB ot smetI uence of Improper Installation
Whether the installation is firm or not The unit may fall, vibrate or make a noise
Whether the inspection on air leakage is completed The refrigerating capacity (heating capacity) may be
insufficient
Whether the unit is fully insulated Condensation or drip may occur
Whether the drainage is smooth or not Condensation or drip may occur
Whether the power voltage is identical to that
marked on the nameplate
Failure may occur or the parts may be burned
Whether the circuit and pipeline are installed
correctly
Failure may occur or the parts may be burned
Whether the unit is safely earthed Electric leakage may occur
Whether the type of wire is in line with relevant
regulations
Failure may occur or the parts may be burned
Whether barriers are identified at the air inlet/outlet
of the indoor/outdoor unit
The refrigerating capacity (heating capacity) may be
insufficient
Whether the length of refrigerant pipes and the
refrigerant amount charged are recorded
The refrigerant amount charged cannot be confirmed
Test Run
1. Preparations
(1) Power on is not allowed before all the installation operations are completed and before the leak
detection is proven qualified.
(2) The control circuit shall be connected correctly and all the wires shall be firmly connected.
(3) The two-way stop valve and three-way stop valve shall be opened.
(4) All the scattered articles (especially the metal filing and thread residue) shall be removed from the unit
body.
2. Methods
(1) Switch on the power supply and press the “ON/OFF” on the remote controller, after which the air
conditioner will start operating.
(2) Press “Mode” to select refrigeration, heating and sweeping wind, and observe whether the air
conditioner is under normal operation.
5
h
s
i
l
g
n
E
6


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Haier Zun Tower at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Haier Zun Tower in the language / languages: English as an attachment in your email.

The manual is 16.71 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info