626222
39
Zoom out
Zoom in
Previous page
1/108
Next page
35
ENGLISH
GB
Inspection and maintenance plan
Regular servicing period Before any
start-up
After 1
month
After 3
months
After 6
months
After 12
months
After 24
months
5
Hours of
operation
25 Hours of
operation
50 Hours of
operation
100 Hours
of opera-
tion
250 Hours
of opera-
tion
Engine oil
(10W-40)
Inspection
9
Change
99
Air lter Inspection
9
Change
9
Spark plug Inspection
Clean
9
Change
9
Provide appropriate servicing upon the earlier of the following: in the given month or after the specied hours of
operation have expired.
Defects searching
Defect
Cause
Measure
The motor does not start
Start-Stop lever has not been pressed Press the Start-Stop lever
Primary pump has not been used Use the primary pump
Lack of fuel Add some fuel
Bowden cables are too long
23
Adjust the Bowden cables using the
coupling nut.
23
Wrong fuel, storing without petrol tank
being drained
Drain the fuel tank and carburettor. Add
fresh petrol.
Sooted spark plug (carbon residues on
electrodes), electrodes distance too big
Clean the spark plug, check the plug ther-
mal value, possibly change the plug, set
the electrodes distance to 0.6-0.7 mm
The spark plug is wet from petrol (over-
saturated engine).
Dry the spark plug out and ret it.
Unsteady running,
strong vibrations
Blade is damaged Replace the blade
Blade is loose Check and tighten the blade clamping
Poor mowing/catching
performance
Blade is blunt Have the blade sharpened or replaced
Collection bag is blocked
Empty the collection bag
11
Mowing height adjustment not
regulated
Adjust the mowing height
9
Grass is not collected Blocked channel
Full collection bag
Too wet grass
Clean the ejection channel
Empty the collection bag
Cut in dry weather
39


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Gude Big Wheeler 565 ES 95341 heeler S at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Gude Big Wheeler 565 ES 95341 heeler S in the language / languages: English, German, Dutch, French, Italian as an attachment in your email.

The manual is 2,6 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info