GMC-I Messtechnik GmbH 61
14.9 Testing the Operating States of Electric Vehicles at
Charging Stations per IEC 61851 (MTECH+ & MXTRA only)
A charging station is an equipment designed for the charging of elec-
tric vehicles per IEC 61851which essentially consists of a plug con-
nector, a cable protection, a residual current device (RCD), as well as
a circuit breaker and a security communication system (PWM).
Depending on the place of installation and application, further func-
tional features such as mains connection and meter may be included.
Adapter selection (test box)
Simulation of operating states per IEC 61851with the MENNEKES test box
(Status A – E)
The MENNEKES test box only serves the purpose of simulating dif-
ferent operating states of an electric vehicle fictitiously connected
with a charging station. The settings for the simulated operating
states are indicated in the operating instructions for the test box.
The simulated operating states can be stored in the MTECH+ or
MXTRA as visual inspection and documented in the ETC software.
The operating state (status) to be tested is selected with the
SECLECT STATUS key at the MTECH+ or MXTRA test instrument.
Status A – Charging conductor only connected with charging point
CP signal is switched on,
voltage between PE and CP is 12 V.
Status B – Charging conductor connected with charging point and
vehicle
the charging conductor is locked at the charging point and in
the vehicle,
vehicle not yet ready for charging,
voltage between PE and CP is +9 V / –12 V.
Status C – Non-gassing vehicle identified
Readiness for charging on the vehicle/power side is activated,
Voltage between PE and CP is +6 V / –12 V.
Status D – Gassing vehicle identified
Readiness for charging on the vehicle/power side is activated,
Voltage between PE and CP is +3 V / –12 V.
Status E – Conductor is damaged
Short circuit between PE and CP,
Charging conductor is unlocked at the charging point,
Voltage between PE and CP is +0 V.
Semi-automatic changing between operating states
As an alternative to the manual
changing between operating
states via the parameter menu
of the SECLECT STATUS softkey
at the test instrument, there is
another fast and convenient
way of changing between the
operating states: select status
parameter AUTO. Each time
after replying to and storing a
visual inspection, an automatic
changeover to the next state
takes place, with the keys
shown on the display corre-
sponding to 01/05 A/E (01 = A, 02 = B, 03 = C, 04 = D, 05 = E).
It is possible to skip the status variants by pressing key I
N
at the
test instrument or at the test socket.
61


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Gossen Metrawatt PROFITEST MXTRA at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Gossen Metrawatt PROFITEST MXTRA in the language / languages: English as an attachment in your email.

The manual is 2,28 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Gossen Metrawatt PROFITEST MXTRA

Gossen Metrawatt PROFITEST MXTRA User Manual - Dutch - 92 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info