12 Measuring Low-Value Resistance
up to 200 Ohm
(protective conductor and equipotential bonding
conductor)
According to the regulations, the measurement of low-value resis-
tance at protective conductors, earth conductors or bonding con-
ductors must be performed with (automatic) polarity reversal of
the test voltage, or with current flow in one (+ pole to PE) and then
the other direction (– pole to PE).
Attention!
!
Low-value resistance must only be measured at voltage-
free objects.
Select Measuring Function
Connection
Via 2-pole adapter only!
Set Parameters
q ROFFSET ON/OFF
– Compensation for Extension Cables with up to 10
If measurement cables or extension cables are used, their resis-
tance can be deducted automatically from the measurement
results. Proceed as follows:
Switch R
OFFSET from OFF to ON. “ROFFSET = 0.00 ” appears in
the footer.
Select a polarity option or automatic polarity reversal.
Short-circuit the end of the measurement extension cable with
the second test probe at the instrument.
Start measurement of offset resistance with I
N
.
An intermittent acoustic signal sounds first,
which is then accompanied by a blinking
warning to prevent an offset value which has
already been saved from being unintentionally
deleted.
Start the offset measurement by press-
ing the release key again or abort mea-
surement by pressing the
key
t
ON/
START
(here = ESC).
Note
If the offset measurement is stopped by an error pop-up
(Roffset > 10 or difference between RLO+ and RLO–
greater than 10%), the offset value that has last been
measured is retained. Inadvertent deletion of an offset
value once established is thus almost ruled out! The
respectively smaller value is otherwise stored to memory
as an offset value. The maximum offset value is 10.0 .
Negative resistances may result due to the offset value.
Measuring ROFFSET
The ROFFSET x.xx message now appears in the footer at the dis-
play, where x.xx may take a value between 0.00 and 10.0 . This
value is subtracted from the actual measuring results for all sub-
sequent R
LO
measurements, if the ROFFSET ON/OFF key has been
set to ON.
Roffset must be determined anew in the following cases:
After switching to a different polarity option
After switching from ON to OFF and back again
You can deliberately delete the offset value by switching ROFF-
SET from OFF to ON.
Note
Only use this function when performing measurements
with extension cables.
When different extension cables are used, the above
described procedure must always be repeated.
q Type / Polarity
The direction in which current flows can be selected here.
q Limits – Setting the Limit Value
The limit value for resistance can be set as desired. If measure-
ment values which exceed this limit occur, the red U
L
/R
L
LED
lights up. Limit values can be selected between 0.10 and
10.0 (editable). The limit value is displayed above the measured
value.
R
LO
ROFFSET: ON OFF
Polarity: +/- to PE
Polarity: +/- to PE
with ramp function
Limit value:
R
LO
> Limit Value
U
L
R
L
47


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Gossen Metrawatt PROFITEST MXTRA at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Gossen Metrawatt PROFITEST MXTRA in the language / languages: English as an attachment in your email.

The manual is 2,28 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Gossen Metrawatt PROFITEST MXTRA

Gossen Metrawatt PROFITEST MXTRA User Manual - Dutch - 92 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info