813479
32
Zoom out
Zoom in
Previous page
1/52
Next page
32
COMMISSIONING THE APPLIANCE
Complete the Commissioning Checklist at the front of this manual
covering:
Thermocouple soundness checks.
This is to include ensuring the thermocouple is secure on
the pilot bracket assembly, lead connection and integrity.
— Flue checks
— Gas checks
— Log/fuel effect layout - ame picture
Ensure all safety checks listed in the Commissioning Section are
completed, paying particular attention to the glass panel checks and
securing of the glass frame.
Upon completion of the commissioning and testing of the installation
and correct operation of the appliance, the installer must instruct the
user how to operate the appliance.
Guide the user through the User Instructions paying particular
attention to:
a) Regular servicing (User Instructions).
b) Ventilation (User Instructions) - point out the ventilation
positions where applicable.
c) Hot surfaces (User Instructions).
PAIRING THE APPLIANCE
It may be necessary to pair the handset to the appliance following
servicing.
Ensure the Power switch on the Control Box is in the ON
( l ) position.
Cradle the handset to unlock.
The green light must be illuminated for the handset to accept
commands.
Simultaneously press and hold the - and + buttons on the Control
Box, until the red light appears on the Control Box.
WARNING: IF THE + AND - BUTTONS ARE
DEPRESSED FOR 20 SECONDS OR MORE THE
LIGHT WILL EMIT A SLOW STEADY PULSE.
FURTHER ACTIONS WILL REMOVE ANY HANDSET
PAIRING.
Release the - and + buttons and within 1 second press the
Power Button on the Control Box.
The handset emits a short beep, the green light on the handset
flashes and the following icon is displayed.
With the display showing the icon press and hold the SET button to
pair the handset to the appliance.
Following new pairing it will be necessary to set the time and date,
see Installation Instructions.
If too much time passes without the SET command the display will
show the following.
The handset has not paired and the process will need to be started
again.
32


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Gazco Sheraton 5 - Balanced Flue at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Gazco Sheraton 5 - Balanced Flue in the language / languages: English as an attachment in your email.

The manual is 8.83 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info