813484
26
Zoom out
Zoom in
Previous page
1/48
Next page
26
COMMISSIONING
Close all doors and windows in the room.
Ignite the appliance and operate on maximum for 10 minutes.
Position a lighted smoke match just inside the draught diverter
opening at the rear of the appliance.
Check all smoke is drawn into the opening.
Rear of Appliance
Draft diverter lip
Smoke match
If there is any doubt, run the appliance for a further 10 minutes, and
repeat the test.
If there are any extractor fans in adjacent rooms, the test must be
repeated with the fans running on maximum and interconnecting
doors open.
IF SPILLAGE PERSISTS, DISCONNECT THE APPLIANCE AND
SEEK EXPERT ADVICE.
Complete the Commissioning Checklist at the front of this manual
covering:
— Thermocouple soundness checks.
This is to include ensuring the thermocouple is secure on
the pilot bracket assembly, lead connection and integrity.
— Flue checks
— Gas checks
— Log layout - flame picture
Upon completion of the commissioning and testing of the
installation and correct operation of the appliance, the installer
must instruct the user how to operate the appliance.
Guide the user through the User Instructions paying particular
attention to:
a) Regular servicing.
b) Ventilation - point out the ventilation positions where
applicable.
c) Hot surfaces.
26


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Gazco Huntingdon 20-30-40 - Conventional Flue at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Gazco Huntingdon 20-30-40 - Conventional Flue in the language / languages: English as an attachment in your email.

The manual is 13.82 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info