5. FUELBED ARRANGEMENTS
Remove the cast iron door using the tool provided. The
main ceramic components are inside the firebox.
NOTE: THE CAST IRON DOOR IS HEAVY, TAKE EXTREME
CARE WHEN HANDLING TO AVOID DAMAGING THE
OUTER CASING.
The fuel bed consists of 5 logs and 2 ash panels. The logs
have letters A,B,C,D and E moulded into them for
identification.
5.7 Take the rear log A and place it up against the rear of the
fire sitting on the two flat ledges of the burner. The two legs
of the log should sit between the rear burner ports. See
diagram 14. Ensure an equal gap between each side of the
log and the side of the firebox.
5.8 Place log B on the left hand side of the burner with the
location bar on the underside of the log fully located in the
long slot of the burner. Make sure the log is as far to the left
as possible. See diagram 15.
5.1 Place log C on the right hand side of the burner with the
location bar on the underside of the log fully located in the
long slot in the burner. Make sure the log is as far right as
possible. See diagram 16.
17
5.2 Place log D across from the rear log A to log B on the left-
hand side. There are cut-outs in both logs for location. See
diagram 17.
5.3 There are two ash panels which lay across the front of the
burner skin. Place the panel with the flat edge facing the left
side of the firebox. There are location holes on this log
which fit over the screw holes of the burner skin.
INSTALLATION INSTRUCTIONS
INSTALLATION
14
AR1610
15
AR1611
16
AR1612
17
AR1613
18
AR1614