11
3.5 Having run the gas supply to the stove, PURGE THE
SUPPLY. This is essential to expel any debris that may block
the gas controls. Connect the gas supply to the 8mm
compression elbow at the RH rear corner of the stove,
ensuring that the pipe position does not interfere with the
location of the outer casing. See Diagram 2.
3.6 Open the second carton and carefully remove the ceramic
outer casing components. Gently position the LH side so that
the bolt heads on the engine subframe locate in the keyhole
slots on the back of the panel and gently slide into place so
that the ceramic comes to rest on the floor. Repeat the
procedure for the RH side. See Diagram 3.
3.7 Remove the cast iron door using the tool provided and
carefully place to one side. Gently position the front ceramic
panel so that the side panels locate inside the returns on the
front panel. Engage the bolt heads in the brackets on the
back of the panel and gently slide into place so that the
ceramic comes to rest on the floor. Ensure that the opening
in the panel sits centrally around the fire box opening. See
Diagram 4.
3.8 Place the top ceramic panel into position so that the two
spring clips slide against the inside of the side panels. Gently
position so that it sits centrally in the outer panels. Place the
cast iron grille into the recess in the centre of the top panel
and locate the blanking plate into the grille, (if required). See
Diagram 5
3.5 Check the pull of the flue system by applying a lighted
smoke pellet to the flue system opening. If there is a definite
flow into the chimney, proceed with the installation. If not,
warm the chimney for a few minutes and repeat the test.
INSTALLATION INSTRUCTIONS
INSTALLATION
3
AR0488
4
AR0490
5
AR0492
2
AR0934