Page 5-2 Rev. 4
5.2 Mounting, Wiring, and Power Checks
Verify that all cables are properly secured and shields are connected to the shield block of the connectors.
Check the movement of the flight and engine controls to verify there is no interference between the
cabling and control systems. Ensure that all wiring is installed in accordance with Section 2.4.11.
Prior to powering up the GTN, the wiring harness must be checked for proper connections to the aircraft
systems and other avionics equipment. Point to point continuity must be checked on all wiring to expose
any faults such as shorting to ground. Any faults or discrepancies must be corrected before proceeding. If
any TVSs are installed as part of the installation, proper TVS installation should be verified prior to
application of power. Refer to Section 3.6.5.1 for guidance on checking each TVS assembly. Also, check
the lighting bus wiring to ensure it is wired correctly before applying power to the GTN.
CAUTION
Incorrect lighting bus wiring could cause damage to the GTN.
After accomplishing a continuity check, perform power and ground checks to verify proper power
distribution to the GTN, including the lighting bus and any high level inputs to the GTN. Any faults or
discrepancies should be corrected at this time. Remove power from the aircraft upon completion of the
harness checkout.
The GTN can be installed after completion of the continuity and power checks. The GTN should be
installed into the rack and secured appropriately, as described in Section 3.4.2. The GTN backplate must
be connected to the wiring harness and antenna coaxial cables.
5.3 Connector Engagement Check
Prior to configuration and checkout of the GTN, the connector engagement should be checked as
described below:
1. Ensure that the GTN GPS/NAV and COM circuit breakers are pulled.
2. Slide the GTN straight into the rack until it stops about 1 inch short of the fully seated position.
3. Insert a 3/32-inch hex drive into the unit retention mechanism access hole at the bottom of the
unit face and rotate the tool clockwise while pressing the bezel until the unit is firmly seated in
the rack.
4. With the GTN seated, reapply power by closing the circuit breakers and turning on the avionics
master switch (if installed).
5. Again, insert the hex drive into the unit retention mechanism access hole. Rotate the tool
counter-clockwise to back out the retention mechanism. Ensure that three (3) complete
revolutions of the Allen screw can be performed without red ‘X’ indication or loss of power to
the GTN.
NOTE
If power is lost or the red ‘X’ condition occurs with fewer than three (3) turns, ensure
there are no obstructions to the unit fully seating in the rack. Also, the mounting rack may
need to be moved aft (toward the pilot) such that the instrument panel does not obstruct
the unit from properly engaging in the rack.
6. Re-seat the GTN per step 3.
140


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Garmin GTN 650 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Garmin GTN 650 in the language / languages: English as an attachment in your email.

The manual is 8,92 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info