646345
12
Zoom out
Zoom in
Previous page
1/23
Next page
12
4.4 VENTILATION REQUIREMENTS
The following notes are for general guidance:
- It is not necessary to have a purpose provided air vent in the room or internal space in which the appliance
is installed.
- If the boiler is to be built into a small cupboard or compartment (i.e. at minimum clearances)and overheat-
ing can be forseen (i.e. close proximity to a cooking appliance etc) permanent air vents are recommended for
cooling purposes in the cupboard or compartment . The following table gives the minimum effective areas of
the vents.
Position of air vent Air from room/int space. Air direct from outside.
HIGH LEVEL 13000 mm² 13000 mm²
LOW LEVEL 7500 mm² 7500 mm²
4.5 ELECTRICITY SUPPLY
The appliance MUST be earthed. A mains supply of 230 V ~ 50 Hz single phase is required.
Wiring external to the boiler MUST be in accordance with current I.E.E. Wiring Regulations (BS 7671) and
any other relevant local regulations. The supply connection to the flying lead provided MUST be made to a
fused double pole switch having a 3 mm (1/8 in ) contact separation in both poles, serving only the boiler and
system controls, is a fused plug and socket or fused spur.
The external fuse rating should be 3A. This connection should be readily accessible and be made adjacent
to the boiler
4.6 GAS SUPPLY
- A Propane gas supply at 37m bar is required.
- Ensure the regulator is of sufficient capacity to carry the maximum boiler input plus the demand for any other
installed appliances.
- Ensure the connection between the supply/bottle and the caravan holiday home or park home is designed
so that no pressure drop occurs.
- No more that 3 m of 15mm pipe should be used. Where the supply exceeds 3 m the pipe should be suit-
ably sized only reducing to 15mm before the boiler
- A full bore isolation cock must be fitted in the supply close to the boiler.
- The complete installation must be tested for gas soundness.
4.7 WATER SYSTEMS - GENERAL
- This appliance is designed for connection to sealed central heating water systems.
- Prior to filling the central heating system (see section 6.2) It is recommended that where the system is
installed in a caravan holiday home, subject to non - continuous use, anti-freeze is used.
4.8 REQUIREMENTS FOR SEALED WATER
SYSTEMS
The heating system design should be based on the fol-
lowing information:
- The available pump head is given below.
- A minimum flow rate corresponding to a heating differ-
ential of 20°C must be obtained at all times.
0
100
200
300
400
500
600
0 200 400 600 800
Flow (l/h)
By-pass closed
By-pass open
AVAILABLE PUMP HEAD
12


Need help? Post your question in this forum.

Forumrules
1

Forum

fagor-feb-20e-uk-ecoplus

Reset search

  • Heating works .hot water comes on for about 30 seconds and nocks off but Heating stays on.if I run hot water with heating off it trips the boiler off Submitted on 10-4-2023 at 09:10

    Reply Report abuse


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Fagor FEB-20E UK ECOPLUS at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Fagor FEB-20E UK ECOPLUS in the language / languages: English as an attachment in your email.

The manual is 1,39 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info