3.3.1 C11, wall terminal
For a facade or wall outlet use a wall terminal (see g. 1.0 C11).
Depending on the calculation this can be a diameter of 130/200mm
or 100/150mm.
3.3.2 C31, roof terminal
For a at or pits roof outlet use a long roof outlet with a diameter of
100/150mm (see g. 1.0 C31)
3.3.3 C91, existing chimney
You can also connect to an existing replace chimney. The existing
chimney functions then as air supply and a exible stainless steel
tube drawn through the chimney carries the ue gases. The exible
stainless steel tube of Ø100mm must have a CE mark have up to
600°C.
Use the short chimney outlet. (See g. 1.0 C91).
The chimney must have the following conditions:
The channel of the chimney must be at least 150x150mm.
There should be no more than one device on a chimney.
The chimney must be in good condition:
o No leakage
o Well cleaned
For more information about connections to existing chimneys, ask
the installation manual “chimney connection set”.
4 Preparation and installation
instructions
4.1 Gas connection
The gas connection must comply with the applicable local
standards. We advise using a Ø15mm gas connection directly from
the gas meter to the appliance, with a shut-off valve in the proximity
of the appliance, which must always be freely accessible. Position
the gas connection so that it is easily accessible at all times for
service and that the burner unit can be disassembled. (See g.
8.0-C and dimensional drawing 16.2 for position of the gas
connection).
4.2 Electrical connection
The power supply must comply with the applicable local standards.
A wall socket 230VAC/50Hz must be installed near the re. For
power supply make use of the included plug adapter. See g 2.0 for
the wiring diagram of this connection and the LED Symbio module.
A = Plug adapter 6V
B = Micro switch
C = Spark transformer
D = LED Symbio module
E = Slider
4.3 Preparing the re
Remove the re from its packaging. Open the operation door
(see g. 3.0), take the packaged parts from the re and
remove the bolts in the bottom plate.
Prepare the gas connection on the regulator. See g. 8.0-C
and dimensional drawing 16.2.
4.4 Positioning the re
Take into account the installation requirements and the minimum
distances around the replace. (See Chapter 3).
4.5 Installing the ue materials
When penetrating a non-combustible wall or ceiling the
opening must be at least 5mm larger than the diameter of the
discharge material. At a combustible wall or ceiling is this
100mm larger than the diameter of the drainage material.
Horizontal sections should be installed with a slope towards
the re (3 degrees).
Build the system from the re. If this is not possible you can
make use of an extendable adapter section.
For truing up the exhaust system use the 0,5m. pipe, which
can be shortened and ensure that the inner pipe is always
2cm longer than the outer pipe.
Parts, which are shortened, must be secured with a
self-tapping screw.
Wall and roof terminals can also be cut.
Do not insulate but ventilate built-in ue material (approx.
100cm²).
5 Removing the glass
5.1 Front glass
Remove the front frame. See g. 4.0.
Slightly loose the screws of the glass support under.
See g. 4.1.
Slightly loose the nuts of the upper glass support and remove
it. See g. 4.2.
Remove the front glass. See g. 4.3.
For replacing the front glass repeat the steps in reverse
order.
> Please note:
Clean all ngerprints on the glass; otherwise they will burn in once
the re is used.
5.2 Side glasses
For cleaning only it’s not necessary to remove the side glasses.
Only remove the front glass. See Chapter 5.1.
Remove the side panel. See g. 5.0.
Slightly loose the screws of the glass support under.
See g. 5.1.
Slightly loose the nuts of the upper glass support and
remove it. See g. 5.2.
Remove the side glass. See g. 5.3.
> Please note:
Clean all ngerprints on the glass; otherwise they will burn in once
the re is used.
9


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Faber Vejen at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Faber Vejen in the language / languages: English as an attachment in your email.

The manual is 9,7 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Faber Vejen

Faber Vejen Installation Guide - German - 28 pages

Faber Vejen Installation Guide - Dutch - 24 pages

Faber Vejen Installation Guide - French - 24 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info