802153
14
Zoom out
Zoom in
Previous page
1/46
Next page
14
In a three-phase installation, all phases must be connected to the Power Box
according to the wiring diagram. This means that the appropriate wires of the power
cable must be connected to their respective phases (L1, L2, L3).
In a three-phase environment, the wires should run through the solid core. However, in
case of thicker wires, you must use three CTs instead of the solid core CT (available as a
three phase CT kit).
Label the current transformers
on the clamp and connector
side to enhance visualisation.
The arrow indicated on the
CT or Solid Core 3-Phase CT
(K > L) must point in the
direction of the current ow.
Mount the supplied bus
termination plug in the free
port of the last CT Hub.
You can use a custom RJ10 cable instead of the standard Bus cable. The RJ10 must
be a twisted pair cable. Pins 1 and 4 and Pins 2 and 3 must be twisted pairs. See the
Bus cable specication in section 11.
14


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for EVBox Smart Charging at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of EVBox Smart Charging in the language / languages: English as an attachment in your email.

The manual is 7.53 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of EVBox Smart Charging

EVBox Smart Charging Installation Guide - English - 5 pages

EVBox Smart Charging Installation Guide - English - 20 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info