•Make sure that the stove is transported in compliance with safety regulations.
Avoid any improper transfers or knocks that may damage the ceramics or the structure.
•The metal structure is coated using high temperature paints. When using the appliance for the first few times, unpleasant odours may be given off due to the
paint of the metal parts that is drying: this is in no way dangerous and in such case, simply ventilate the premises. After the first heating cycles, the paint will
reach its maximum adhesion and all its chemical and physical features.
•The reload the hopper, simply open the access lid and pour in the pellets, also during normal operation, making sure that no pellets fall out of it. Always refuel
the hopper before leaving the operating stove unattended for long periods of time.
•Whenever the hopper and the auger tube become completely empty, the appliance will be automatically switched off. It may take two separate ignitions to
resume operation at ideal working conditions as the auger tube is very long.
•ATTENTION! If the stove is not properly installed, power outages may result in fume spillages. Under specific circumstances, an uninterrupted
power supply unit must be installed.
•ATTENTION! Being a heating appliance, some parts of the stove can become extremely hot. We therefore recommend paying special attention
during operation.
WHEN THE STOVE IS WORKING:
odo not open the door;
odo not touch the door glass since it becomes extremely hot;
okeep children away from it;
odo not touch the fume outlet;
odo not pour any liquid inside the firebox;
odo not perform any maintenance operations if the stove is not cold;
oonly qualified technicians are allowed to perform any operation;
ofollow all the instructions contained herein.
INTRODUCTION
INSTALLATION WITH WALL FUME OUTLET IS PROHIBITED. INSTEAD THE FUME OUTLET MUST BE ROOF-TYPE AS PROVIDED FOR BY NATIONAL
REGULATIONS.
Eva Stampaggi S.r.l. declines any liability for any damage to persons or property arising from the failure to comply with the points mentioned above
and from non-compliant product installation.
Install the stove according to the regulations in force in the country of use.
For example, in Italy this refers to UNI 10683: 2012, which dictates 4 points
1. preliminary activities - for which the retailer/installer is responsible and liable for at the time of the inspection before definitive installation. The preliminary
activities include:
•installation site suitability verification;
•fume evacuation system suitability verification;
•external air inlet suitability verification;
At this stage, it is necessary to check that the product can be safely operated and that it satisfies the relevant technical characteristics.
The safety conditions must be ascertained by means of a prior inspection.
Stoves and fireplaces are heating systems and must be installed safely and comply with the manufacturer's instructions!
2. Installation - responsibility of the installer. At this phase, the aspects of installation of the product and of the fume evacuation system are taken into account
and the following issues are addressed:
•safety distance from combustible materials;
•chimney flue construction, smoke ducts, intubated systems and chimney cowls.
3. issuing of additional documents - responsibility of the installer.
Issuing of the technical documentation must include:
•manual of use and maintenance of the appliance and of the components of the system (e.g. smoke ducts, chimney flue, etc.);
•Photocopy or photograph of the chimney flue plate;
•system manual: (if applicable);
•Declaration of Conformity in relation to Ministerial Decree 37/08.
4. control and maintenance - responsibility of the maintenance technician who must oversee protection and maintenance of the product during its operation over
time. The operator in charge of control and maintenance of the systems for winter and summer climate control performs these activities to a professional standard
in accordance with the regulations in force. The operator, at the end of these operations, must draw up and sign a technical inspection report in accordance with
the models provided by the provisions of this decree and the implementing rules, in relation to the type and capacity of the system, to be issued to the person who
signs a copy thereby confirming receipt and reading thereof."
02. VENT PIPE
THE PRODUCTION OF THE STOVES IS REQUIRED WITH HIGHER PERFORMANCES, SO IT IS IMPORTANT TO PERFORM THE INSTALLATIONS
ACCORDING TO THE LAW. IF THE FLUE DUCT PASSES THROUGH NON-HEATED AREAS, IT MUST BE INSULATED FOR A PROPER COMBUSTION.
Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.
Product:
Forumrules
To achieve meaningful questions, we apply the following rules:
First, read the manual;
Check if your question has been asked previously;
Try to ask your question as clearly as possible;
Did you already try to solve the problem? Please mention this;
Is your problem solved by a visitor then let him/her know in this forum;
To give a response to a question or answer, do not use this form but click on the button 'reply to this question';
Your question will be posted here and emailed to our subscribers. Therefore, avoid filling in personal details.
Register
Register getting emails for Eva Calor Futura 19.5 kW at:
new questions and answers
new manuals
You will receive an email to register for one or both of the options.
Get your user manual by e-mail
Enter your email address to receive the manual of Eva Calor Futura 19.5 kW in the language / languages: English as an attachment in your email.
The manual is 5,83 mb in size.
You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.
If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.
The email address you have provided is not correct.
Please check the email address and correct it.
Your question is posted on this page
Would you like to receive an email when new answers and questions are posted? Please enter your email address.