814117
5
Zoom out
Zoom in
Previous page
1/17
Next page
The metal structure is coated using high temperature paints. When using the appliance for the first few times, unpleasant odours may be given off due to the
paint of the metal parts that is drying: this is in no way dangerous and in such case, simply ventilate the premises. After the first heating cycles, the paint will
reach its maximum adhesion and all its chemical and physical features.
To refill the tank, simply lift the access cover and pour the pellets in, even when the machine is on, taking care not to spill outside of the tank. Always refuel the
hopper before leaving the operating stove unattended for long periods of time.
Whenever the hopper and the Auger tube get completely empty, the appliance will be automatically switched off. It may take two separate ignitions to resume
operation at ideal working conditions since the Auger tube is very long.
ATTENTION! If the stove is not properly installed, power outages may result in fume spillages. In some cases, it may be necessary to install an
uninterruptible power supply.
ATTENTION! Being a heating appliance, some parts of the stove can become extremely hot. For precisely this reason, we advise that you take
extreme care during operation.
WHEN THE STOVE IS OPERATING:
o do not open the door;
o do not touch the door glass since it becomes extremely hot;
o keep children away from it;
o do not touch the fume outlet;
o do not pour any liquid inside the firebox;
o do not perform any maintenance operations if the stove is not cold;
o only qualified technicians are allowed to perform any operation;
o follow all the instructions contained herein.
03. MINIMUM INSTALLATION REQUIREMENTS
INTRODUCTION:
INSTALLATION WITH WALL FUME OUTLET IS PROHIBITED. INSTEAD THE FUME OUTLET MUST BE ROOF-TYPE AS PROVIDED FOR BY NATIONAL
REGULATIONS.
Eva Stampaggi S.r.l. assumes no responsibility for damage to persons and/or property caused by non-compliance with the point highlighted above
for products installed in a non-compliant manner.
Install the stove according to the regulations in force in the country of use.
For example, in Italy this refers to UNI 10683: 2012, which dictates 4 points:
a. preliminary activities - are under the jurisdiction and are the responsibility of the reseller/installer at the time of the pre-installation inspection. The preliminary
activities include:
installation site suitability verification;
fume evacuation system suitability verification;
external air inlet suitability verification.
At this stage it is necessary to check that the product can be safely operated and that it satisfies its technical characteristics.
The safety conditions must be assessed with a preventive inspection.
Stoves and fireplaces are heating systems and as such must be installed safely and according to the manufacturer's instructions!
b. installation - under the responsibility of the installer. In this phase the installation of the product and the smoke exhaustion system are considered as well as
the handling of topics such as:
safety distance from combustible materials;
chimney flue construction, smoke ducts, intubated systems and chimney cowls.
c. issuance of supplementary documentation - the responsibility of the installer.
The production of technical documentation must include:
manual of use and maintenance of the appliance and of the components of the system (e.g smoke ducts, chimney flue, etc.);
Photocopy or photograph of the chimney flue plate;
system manual: (if applicable);
Declaration of Conformity in relation to Ministerial Decree 37/08.
4. control and maintenance - the responsibility of the maintenance technician who must oversee protection and maintenance of the product during its operation
over time. The operator charged with checking and maintaining the systems for winter and summer climate control carries out activities in a workmanlike manner
and in respect of applicable regulations. The operator, at the end of these operations, must draw up and sign a technical inspection report in accordance with the
models provided by the provisions of this decree and the implementing rules, in relation to the type and capacity of the system, to be issued to the person who
signs a copy thereby confirming receipt and reading thereof."
In addition to what is specifically provided for in the following paragraphs of this Instruction Manual, the Purchaser must comply with the following minimum
installation requirements:
a) Do not invert or place the stove horizontally on one side;
b) The power of the stove must be adapted to the size of the room where it is to be installed and the room must be ventilated from the outside;
c) The assembly of the flue pipe must be carried out in a workmanlike manner and according to European (UNI 10683) and national regulations, local
regulations and the technical specifications and warnings contained in this Instruction Manual;
d) The smoke outlet must be connected to the flue pipe by means of telescopic fittings;
e) The diameter of the flue must be less than 150 mm.
f) The connection to the flue pipe must be made with an inclination connection of less than 45°;
g) The flue pipe must be suitably insulated;
h) The minimum length of the horizontal section must be greater than 2 metres;
i) The minimum slope of the horizontal section must be 5%
j) The chimney and/or flue pipe must be waterproofed;
k) The flue shall not have more than two changes of direction;
l) The flue gas must be discharged directly into the flue pipe;
m) The flue gas duct must have a length of less than 6.0 m before the flue, with a maximum horizontal section of 3.0 m;
n) The flue and flue duct must not narrow in width from the initial diameter for its entire length. The initial diameter shall be that of the exhaust outlet of the
stove body;
o) The minimum value of the ventilation duct opening must be 80 cm²;
p) The distance of the flammable walls must be respected, as prescribed on the “stove data plate”;
q) The burn pot must be cleaned before each ignition of the stove.
The Buyer must not make any structural changes to the stove and must not make any operating changes to the electrical board.
Installation and connection must be carried out by the Purchaser and by qualified technical personnel, in compliance with European (UNI 10683) and national
regulations, local regulations and assembly instructions contained in this Instruction Manual.
Eva Stampaggi S.r.l. assumes no criminal and/or civil liability, direct and/or indirect, for damage to persons or property resulting from non-compliance with the
aforementioned provisions of law, assembly instructions, warnings and general safety rules indicated in this Instruction Manual.
Anti-explosion
Some products are equipped with anti-
explosion safety devices. Before
switching on the product or, in any case,
after any cleaning operation, make sure
that the device is correctly positioned in
its seat. The device is located on the
firebox door upper edge.
4
5


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Eva Calor Dante at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Eva Calor Dante in the language / languages: English as an attachment in your email.

The manual is 2.19 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Eva Calor Dante

Eva Calor Dante User Manual - German - 16 pages

Eva Calor Dante User Manual - Dutch - 38 pages

Eva Calor Dante User Manual - French - 17 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info