INSTALLATION
Remove packaging material and ensure that the Cool Perfect always remains upright, even
during unpacking. Use the handles to lift the unit. The Cool Perfect is a mobile unit that can be
moved from room to room.
Place the Cool Perfect on a sturdy, flat, dry and horizontal surface. Make sure that the unit
has at least 50 cm of free space on all sides and take all safety instructions into account.
The device distributes air and sucks air. It must therefore be installed in a space that is not
excessively small or narrow. Do not use it in a ‘wet’ room (bathroom/laundry room, etc.) or
place it in direct sunlight in order to prevent overheating or discolouration.
Check the water drain. Do you wish to cool or heat? Then the cap (B) and the button (A) must
be screwed firmly onto the drain. Would you like to dehumidify? Then you must fit a drainage
hose. See ‘dehumidification’
If you wish to cool or heat – choose a location
near an outlet point for the hot or cold air, e.g. a
window that can be partially opened.
Place (if desired) window panel in the window
opening. The length of the window panel can be
adjusted from 67 to 125 cm. If necessary, you
can shorten it .
Don’t forget about preventing access to burglars!
Cooling:
Attach the flexible hose before you start using the device:
Rotating the hose in the
direction of arrow 1 fastens
it to the device. You
unfasten it by rotating in the
direction of arrow 2.
Rotate connection B onto
the other end of the hose.
and place it with the oval
opening in the opening in
the window panel.
Avoid kinks or bends in the
hose and keep it sloping
slightly upwards. Kinks and
bends will lead to a build up
of damp, waste air which
can cause overheating or
lead to the Cool Perfectair
switching off. Keep the hose
as short as possible.