Preparation for the Installation
Once the foundation is dry and the power cables are
introduced into the installation pipe, the installation of
the charging station can begin.
• Clean the foundation, its surroundings and anchor
bolts.
• Cut the installation pipe containing the power
cables.
• Shorten the earthing strip to the appropriate length
and drill a hole in it.
Preparation of Supply Cables
Shorten the power cord and remove the cable sheath -
make sure there is no voltage in it beforehand. Shorten
the cables to the appropriate length (40 cm) so that you
can connect them to the terminals in the charging
station.
Remove 20 mm of insulation from all cables and attach
and compress the appropriate crimp tubes on all cables.
To prevent cables from getting in the way of mounting
the charging station, twist them into an installation pipe.
Length of cables on the other side of the gland should be:
• Power supply cables (L1, L2, L3, N): 15 cm with
insulation and stripped cable jacket + 2 cm without
insulation
• Grounding cable: 10 cm with insulation
• Ethernet UTP cable: 17 cm with insulation
Mounting the Charging Station
Grab the charging station for both sockets, tilt it towards
you and lift it slightly. Place the charging station on the
foundation. In the event of strong winds, make sure that
the charging station does not tip over.
Unlock and open the door with the key located in one of
the sockets. Take the five nuts and tighten them firmly
on the anchor bolts.