FILLING THE UNIT WITH WATER
Ensure that all ttings and immersion heaters are
correctly tted and tightened. An immersion heater key
is provided to aid tightening the immersion heater(s)
Check expansion vessel pre-charge pressure
The vessel is supplied precharged to 0.35MPa
(3.5 bar) to match the control pressure of
the pressure reducing valve. The precharge
pressure is checked using a car tyre gauge by
unscrewing the plastic cap opposite the water
connection.
Check all connections for tightness including the
immersion heater(s). An immersion heater key
spanner is supplied for this purpose.
Ensure the drain cock is CLOSED.
Open a hot tap furthest from the cylinder.
Open the mains stop cock to ll the unit. When
water ows from the tap, allow to run for a few
minutes to thoroughly ush through any residue,
dirt or swarf, then close the tap.
Open successive hot taps to purge the system
of air.
SYSTEM CHECKS
Check all water connections for leaks and rectify
as necessary.
Turn off mains water supply.
Remove the pressure reducing valve head work
to access the strainer mesh, clean and re-t.
Manually open, for a few seconds, each relief
valve in turn, checking that water is discharged
and runs freely through the tundish and out at
the discharge point.
Ensure that the valve(s) reseat satisfactorily.
DIRECT UNITS
Switch on electrical supply to the immersion
heater(s) and allow the cylinder to heat up to
normal working temperature (60°C recommended,
approximately graduation 4 on the thermostat).
If necessary the temperature can be adjusted by
inserting a at bladed screwdriver in the adjustment
knob on top of the immersion heater thermostat and
rotating. The adjustment range 1 to 5 represents
a temperature range of 12°C to 68°C. Check
the operation of thermostat(s) and that no water
has issued from the expansion relief valve or
temperature/pressure relief valve during the heating
cycle.
INDIRECT UNITS
Fill the indirect (primary) circuit following the boiler
manufacturer’s commissioning instructions. To ensure
the cylinder primary heat exchanger is lled, the 2
port motorised valve (supplied) should be manually
opened by moving the lever on the motor housing to
the MANUAL setting. When the primary circuit is full
return the lever to the AUTOMATIC position.
Switch on the boiler, ensure the programmer is
set to Domestic Hot Water and allow the cylinder
to heat up to a normal working temperature (60
o
C
recommended, approximately graduation 4 on the
thermostat). If necessary the temperature can be
adjusted by inserting a at bladed screwdriver in
the adjustment knob and rotating. The minimum
thermostat setting is 12°C.
The adjustment range 1 to 5 represents a
temperature range of 12°C to 68°C.
Check the operation of the indirect thermostat and
2 port motorised valve and that no water has issued
from the expansion relief valve or temperature/
pressure relief valve during the heating cycle.
BENCHMARK LOG BOOK
On completion of the installation and commissioning
procedures detailed in this manual the Benchmark
“Installation, Commissioning and Service Record Log,
pages 22 and 23 should be completed and signed off
by the competent installer or commissioning engineer
in the relevant sections. The various system features,
location of system controls, user instructions and
what to do in the event of a system failure should be
explained to the customer. The customer should then
countersign the Benchmark
TM
commissioning checklist
(page 22) to accept completion. The Service Record
should be lled in when any subsequent service or
maintenance operation is carried out on the product.
COMMISSIONING
14


Need help? Post your question in this forum.

Forumrules
1

Forum

elson-zircon

Reset search

  • Hi. My cylinder is getting too hot. Boiler continues to run for hot water when programmer is off for heating and hot water. Diverter valve is working so what else could be causing this? Submitted on 14-1-2023 at 11:28

    Reply Report abuse


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Elson Zircon at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Elson Zircon in the language / languages: English as an attachment in your email.

The manual is 2,28 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info