569722
13
Zoom out
Zoom in
Previous page
1/164
Next page
Installation
Connecting the boiler
11
Connecting the boiler
This chapter will explain how to make
all connections to the boiler with regard
to:
Hydraulic connections
Condensate drain connection
Gas connection
Flue gas connection
Air intake connection
(under casing)
Electrical connection
The boiler should always be connected
in such a way, that the system applies
to all relevant standards and regulati-
ons (European, national and local). It’s
the responsibility of the installer to en-
sure that all standards and regulations
are respected.
Hydraulic connections
The boiler should always be connected
in such a way, that water flow through
the boiler can be ensured at all times.
Connect the flow (4) and return (5) con-
nection of the system tension free to
the boiler connections. If the boiler is
used in a system with two return cir-
cuits, the common return becomes the
low temperature return, the 2nd return
connection (6) is the high temperature
return (remove cap/flange before con-
necting).
The (optional) accessory kit with safety
valve, manometer and deaerator
should be mounted on the flow connec-
tion (4) of the boiler, before connecting
to the system.
The (optional) pump kit should be
mounted directly to the return connecti-
on (5) of the boiler, before connecting
to the system.
Condensate connection (8)
After filling with water, the syphon
(included in delivery) should be in-
stalled to the connection at the bottom
of the condensate receptacle. Lead the
hose under the frame at the back of the
boiler and connect it to the draining
system in the boiler room. The connec-
tion to the draining system should al-
ways be done with an open connection,
in order to avoid a flooding of the boiler
in case of a blocked drain.
8
1 3
4 5 6
13


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Elco LMS regeling - R600 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Elco LMS regeling - R600 in the language / languages: Dutch as an attachment in your email.

The manual is 4,15 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Elco LMS regeling - R600

Elco LMS regeling - R600 Quick start guide - Dutch - 4 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info