571150
13
Zoom out
Zoom in
Previous page
1/27
Next page
395823110a 13
Many building code inspectors follow these guidelines when approving
installations.
The methods approved by the NFPA are:
Cutting away all combustible material in the wall a sufficient distance
from the single wall connector, to provide the required 12” (300 mm)
clearance for the connector. Any material used to close the opening
must be noncombustible (as in Fig . C).
Using a section of double-wall chimney with a 9” (230 mm) clearance
to combustibles.
Placing a chimney connector pipe inside a ventilated thimble, this is
then separated from combustibles by 6” (150 mm) of fiberglass
insulating material.
Placing a chimney connector pipe inside a section of 9” (230 mm)
diameter, solid-insulated factory built chimney, with two inches of air
space between the chimney section and the combustibles.
Chimney connection is a freestanding installation Chimney connector enters chimney above the fireplace
An approved wall pass-through for the United States
A. Chimney connection is a freestanding installation B. Chimney connector enters chimney above the fireplace
C. An example of an approved wall pass-through
13


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Efel STANFORD 80 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Efel STANFORD 80 in the language / languages: English as an attachment in your email.

The manual is 2,33 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info