ENGLISH
ENGLISH
COVERING ASSEMBLY
Covering parts
Covering parts list
• 12 side tiles (11)
• top tiles: right (14) and left (13)
• ceramic shelf (85)
• the aluminium fastening bar (12) is included in the stove
packaging and NOT with the ceramic tiles
NOTE
The numbering is the same as on the exploded view (p. 74)
where the code numbers are found
Covering assembly
After installing the stove correctly, proceed as follows WI-
THOUT removing the top.
Side tiles.
Fit each part (11) in the groove provided in the support bar,
starting from the bottom. Place the rubber pads provided
between the parts (G) After tting six tiles on one side, push
the fastening bar into place to fasten them (12).
Do the same on the other side.
Top tiles
The two ceramic top parts (right and left) simplyrest in the
grooves provided
Ceramic shelf
Open the stove door. Remove the two panel screws. Insert the
shelf in the grooves and USE SILICONE to fasten it.
Assembly of the plate covering
Metal parts of the covering
Proceed with insertion as for the ceramic covering
G: rubber pads provided for placing between the parts
side ceramic parts
PLATE COVERING
CERAMIC COVERING