810855
62
Zoom out
Zoom in
Previous page
1/65
Next page
Sequenza montaggio “GHISE FOCOLARE”
• before inserting the cast iron hearth plates, the ceiling (2d), pre-mounted in the thermo fireplace, must be
removed by loosening the two screws, then proceed with installation.
• front left side (2c)
• rear left side (2b)
• front right side (2c)
• rear right side (2b)
• bottom (2a) (unscrew the two screw on the bottom of the structures and use them to block it in place)
• hearth base (3)
• insert the previously removed ceiling (2d), making sure the gasket is well-adhered (present in the housing
of the ceiling) to the bottom (2a), then screw the ceiling to the fireplace structure using the 2 screws.
N.B.: L’unico elemento da avvitare è il "fondale (2a)". I fianchi (2b-2c) devono essere semplicemente posizionati
in sede (attenzione, restano instabili fino al fissaggio del fondale 2a).
Assembly sequence of “CAST IRON HEARTH PLATES”
• before inserting the cast iron hearth plates, the ceiling (2d), pre-mounted in the thermo fireplace, must be
removed by loosening the two screws, then proceed with installation.
• front left side (2c)
• rear left side (2b)
• front right side (2c)
• rear right side (2b)
• bottom (2a) (unscrew the two screw on the bottom of the structures and use them to block it in place)
• hearth base (3)
• insert the previously removed ceiling (2d), making sure the gasket is well-adhered (present in the housing
of the ceiling) to the bottom (2a), then screw the ceiling to the fireplace structure using the 2 screws.
NOTE: The only component to screw in is the "bottom (2a)". The sides (2b-2c) must simply be positioned in
their housings (attention, they remain unstable until the bottom is secured 2a).
Secuencia de montaje "PARTES INTERNAS DEL HOGAR"
Antes de proceder con la introducción de las paredes internas es necesario desmontar la parte superior (2d) pre-mon-
tada en la termochimenea desatornillando los dos tornillos, luego proceder con el montaje:
lateral anterior izquierdo (2c)
lateral posterior izquierdo (2b)
lateral anterior derecho (2c)
lateral posterior derecho (2b)
fondo (2a) (desatornillar los dos tornillos en el fondo de la estructura de chapa y utilizarlos para bloquearlo)
plano fuego (3)
introducir la parte superior (2d) desmontada precedentemente, adhiriendo bien la empaquetadura (presente en el alo-
jamiento de la misma) al fondo (2a), luego atornillar la parte superior (2d), con los 2 tornillos a la estructura de la chi-
menea.
N.B. El único elemento que atornillar es el “fondo (2a)", los laterales (2b-2c) solo deben ser colocados en el alo-
jamiento (atención, permanecen inestables hasta que no se fija el fondo 2a).
sk tecnica multi MONTAGGIO GHISE FORTE PLUS:Layout 1 22/05/2012 12.16 Pagina 1
62


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Edilkamin Forte Plus at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Edilkamin Forte Plus in the language / languages: English, Italian, Portuguese, Spanish as an attachment in your email.

The manual is 3.87 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info