742012
26
Zoom out
Zoom in
Previous page
1/108
Next page
25
2.16. If the stove has special characteristics, like radiant floor heating or parts governed by thermostatic valves, a
buffer tank is needed to achieve the right regulation.
2.17. Depending on the material used for the hydraulic circuit, consider using an electrolytic sleeve.
2.18. It is highly advisable to perform regular checks to assess the quality of the water in the system, especially if
more water is being added. If you use a water treatment product, make sure it is compatible with the
materials used in the heating installation. To do so, please contact the product’s manufacturer.
2.19. In order to refill the stove with fuel, the user must open the hopper lid and empty the contents of the fuel
tank carefully, to prevent it from overflowing.
Drawing 1
3. FUEL QUALITY.
Your boiler is designed to operate with wood pellets; however, it can also work with other biomass fuels (ask
your dealer about this). Many types of pellets are sold on the market, with very different quality levels. For this
reason, it is very important to choose pellets free from dirt, with no excessive level of damp nor additives that
compact sawdust.
The boiler output may vary depending on the type of pellets you use.
ECOFOREST do not have any control on the quality of the pellets you use. For this reason, ECOFOREST cannot
guarantee the full output of your boiler nor the eventual premature aging or eventual damage of the gas outlet. It is
recommended to use ECOFOREST pellets which are approved as per European standard DIN 51731 and
distinguished by the logo of ECOFOREST printed on the 15kg bags.
If you use other biomass fuels, please note that the boiler’s operating parameters and, in most cases, the
combustion grate, are not the same as those used for wood pellets. Before burning any fuel other than wood pellets,
consult your dealer on whether the desired type of fuel can be used, as well as the requirements it should meet,
and/or the type of grate necessary.
4. INSTALLATION.
The below security distances and assembly diagrams are given for information only as an adaptation shall be
made depending on the norms in force regarding gas outlet, power, security minimum distances specific to
geographic areas.
The installation of the boilers must be done in the same way, for this reason, only the DUBLÍN model will be
exposed. In the same way, air inlets and water connections will be missed in all drawings as section 4.11 indicates
the minimum security distances to be respected for their installation.
UNPACKING THE BOILER.
4.1. Remove the packaging and the protective plastic.
4.2. Remove the screws or bolts that fasten the boiler to the pallet and remove it.
4.3. If our model has a plastic protection, it must be removed before starting it.
MATERIAL REQUIRED FOR INSALLATION.
4.4. Mandatory stainless steel pipe (AISI 316L), never use aluminum, galvanized or iron pipe.
Hopper lid.
Fuel.
26


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Ecoforest Dublin II at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Ecoforest Dublin II in the language / languages: English, French, Italian, Portuguese, Spanish as an attachment in your email.

The manual is 5,18 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Ecoforest Dublin II

Ecoforest Dublin II Installation Guide - English - 136 pages

Ecoforest Dublin II Additional guide - English - 160 pages

Ecoforest Dublin II Installation Guide - French - 136 pages

Ecoforest Dublin II Additional guide - French - 160 pages

Ecoforest Dublin II Installation Guide - Italian - 136 pages

Ecoforest Dublin II Additional guide - Italian - 160 pages

Ecoforest Dublin II Installation Guide - Portuguese - 136 pages

Ecoforest Dublin II Additional guide - Portuguese - 160 pages

Ecoforest Dublin II Installation Guide - Spanish - 136 pages

Ecoforest Dublin II Additional guide - Spanish - 160 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info