815582
29
Zoom out
Zoom in
Previous page
1/144
Next page
28
1. PLEASE BEWARE THAT...
In order to prevent the risk of accident, a correct installation must be done following the instructions of this
manual. Your ECOFOREST distributor will be available to help you and provide you information related to codes,
assembly and installation norms in your area.
As ecoforest do not have direct control on the installation of your stove, ecoforest do not guarantee it and do
not bear the responsibility of any damage that could result from a bad use or a bad installation.
We carefully recommend the heat calculation to be made by a qualified heating engineer.
We recommend that a confirmed specialist sets up your pellets stove.
Maintenance work to be carried out at the end of the season or for every 500 kg of fuel burned, as well as any
repairs or equipment modifications, must be performed by authorized personnel.
Before getting started with the stove installation, please check section 4.
2. ADVICE AND RECOMMENDATIONS.
2.1. All local regulations, including those referring to national and European standards must be met when installing
the boiler.
2.2. The stove must be installed on floors of sufficient bearing capacity and, if the existing construction does not
allow this, the floor must be adapted and made suitable, for example by fitting a load distribution plate.
2.3. Never use petrol, fuel for lanterns, kerosene nor any similar liquid. Keep this kind of fuel away from your stove.
2.3. Do not try to turn on your stove if some glass is broken.
2.5. Make sure the glass door of the fireplace is well closed while the boiler is in operation; also check the cleaning
hatches (if you have touched them).
2.6. Unauthorized modifications are forbidden. Use only spare parts provided by Ecoforest (see exploded view).
2.7. Do not overload the stove; continuous heating efforts might cause premature aging and damage paint (it is
recommended not to exceed 250°C for gas outlet temperature).
2.8. Do not use the stove as a burner.
2.10. To prevent possible electrical shocks, only trained personnel should have access to the sides and the back of
the stove.
2.12. To load fuel in the stove, we must open the hopper lid and empty the fuel bag carefully to prevent fuel
overflow. See drawing 1 (Dubai). In the Kiev insert model (drawing 2) scroll left the door leading to the hopper,
to carry the load. We recommend charging the hopper when the stove is cold. If the stove is an Oslo Insert
model (drawing 3), the load is done through the pellet loading door that must be installed on the decoration
(right or left side). Drawing 4 shows access to the fuel load in the Boston Insert model. For other models it is
performed similarly to the Dubai model.
Drawing 1

Hopper lid.

Fuel.
29


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Ecoforest Boston Insert at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Ecoforest Boston Insert in the language / languages: English, French, Italian, Portuguese, Spanish as an attachment in your email.

The manual is 6.29 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Ecoforest Boston Insert

Ecoforest Boston Insert User Manual - English, German, Dutch, French, Italian, Portuguese, Spanish - 228 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info