571216
37
Zoom out
Zoom in
Previous page
1/170
Next page
Preparing the connection to
chimney
When connecting the appliance to the chimney you
have the choice of connecting via either the upper
side, the side or the rear. See the paragraphs
"Connecting to the top side or on the side" and
"Connecting to the rear".
The appliance is not supplied with a flue gas
opening.
Sealant and materials supplied.
For Germany, the appliance is supplied with a
connection collar with a diameter of 130 mm.
When connecting to the upper side an opening has
to be made in the heat shield. At the spot when the
opening has to be made an incision has been made
in the heat shield.
Preparation for connection at the
rear side
Make the necessary opening in the heat shield.
1. Unhook the heat shield from the appliance.
2. Make the opening in the heat shield by cutting the
pre-cut section out of the heat shield using plate
shears.
3. Replace the heat shield back onto the appliance.
Connecting to the upper side, rear
side or on the side
First make the flue gas opening in the appliance by
removing the connection cover. Use the equipment
provided: the tension piece, the washer, the nut and
bolt; see following figure.
1. In the centre of the connection cover, drill a hole
with a diameter of 10 mm.
2. Place the tension piece and the bolt on the inner
side of the connection cover.
3. Slide the washer over the bolt and tighten the nut
onto the bolt.
On enamelled appliances, place a piece of
cardboard measuring a minimum of 20 cm by
20cm between the washer and the appliance to
protect against chipping of the enamel.
4. Tighten the nut by hand. Use a small amount of
grease to make it easier to turn the nut.
5. Using a ring spanner, tighten the nut so that the
connection cover breaks out.
6. Once made a flue gas opening can be closed off
again with the supplied shut-off cover (A). Use the
mounting plate (C) and bolt M6x25 (D) to fit the
cover to the appliance (B); see the following figure.
Subject to change because of technicalimprovements
9
37


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Dovre 360CB3 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Dovre 360CB3 in the language / languages: English, German, Dutch, French, Italian, Spanish as an attachment in your email.

The manual is 14,93 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info