596386
18
Zoom out
Zoom in
Previous page
1/40
Next page
5 Operating the appliance
5.1 Putting the appliance into operation
1. Check the water pressure in the installation shown on the control
panel display.
If the water pressure is lower than 0,8 bar, more water
should be added. If necessary, top up the water level in the
heating system (recommended hydraulic pressure
between 1,5 and 2,0 bar).
2. Open the gas valve on the boiler.
3. Switch on the boiler.
4. The start-up cycle begins and cannot be interrupted. During the
start-up cycle, the display shows the following information:
fK[xx
: Software version
pK[xx
: Parameter version
The version numbers are displayed alternately.
5. A vent cycle of a duration of around 3 minutes is carried out
automatically.
6. In standby mode, the screen usually displays
0
, plus the water
pressure and the symbols
d
and
r
.
5.2 Reading out measured values
The following current values can be read off the information menu
Q:
4 5t = State.
4 5v = Sub-status.
4 t1 = Flow temperature (°C).
4 t" = Return temperature (°C).
4 t3 = DHW tank temperature (°C).
4 t4 = Outside temperature (°C).
4 t5 = Solar boiler temperature (°C).
4 t6 = Solar panel temperature (°C).
4 5p = Internal set point (°C).
4 fl = Ionization current (µA).
4 Mf = Fan speed in rpm.
4 pr = Water pressure (bar (MPa)).
4 p; = Supplied relative heat output (%).
5. Operating the appliance
EGC 25
17
28/05/2015 - 300026082-001-04
18


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for De Dietrich TWINEO EGC 25 BE at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of De Dietrich TWINEO EGC 25 BE in the language / languages: English as an attachment in your email.

The manual is 1,9 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of De Dietrich TWINEO EGC 25 BE

De Dietrich TWINEO EGC 25 BE Installation Guide - German - 96 pages

De Dietrich TWINEO EGC 25 BE User Manual - German - 44 pages

De Dietrich TWINEO EGC 25 BE User Manual - Dutch - 40 pages

De Dietrich TWINEO EGC 25 BE User Manual - French - 32 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info