607568
4
Zoom out
Zoom in
Previous page
1/20
Next page
4
DTG130 - 45/65/90/115 Eco.NOx Plus 18/06/2015 - 300005222-02
1.2 Recommendations
For a proper operating of the boiler, follow
carefully the instructions.
Any intervention on the appliance and heating
equipment must be carried out by a qualified
engineer.
The manufacturer is not liable for any improper
use of the appliance or failure to maintain or
install the unit correctly (the user shall take care
to ensure that the system is installed by a
qualified engineer).
Check the seal on the gas and water pipe
connections.
Check that the appliance is properly set for the
type of gas used.
Keep to the polarity shown on the terminals:
phase (L), neutral (N) and earth
4
.
Check regularly that the installation contains
water and is pressurised.
Burn hazard in direct contact with the flame
inspection window.
1.3 Ventilation
1.3.1 Chimney versions
Do not obstruct the air inlets in the room (even
partially).
France: the cross section of the aeration vent, which is
compulsory in the boiler room in which the boiler is
installed, must comply with the DTU 61.1 (P 45 204)
standard and, in particular, with the instruction on boiler
room layout (Book 1764 April 1982).
Belgium:the cross-section of the aeration vents, which
are compulsory in the room in which the boiler is installed,
must comply with the NBN D51-003 standard.
Germany: the cross section of the ventiliation vents,
which are compulsory in the room in which the boiler is
installed, must comply with the VDI 2050 form 1 standard
and with other prevailing regulations.
Other countries: the cross section of the aeration inlet,
which is compulsory in the premises in which the boiler is
installed, must comply with the standards in force in the
country.
1.3.2 Forced flue versions
It is not necessary to provide ventilation of the premises
in which the boiler is installed. Ventilation is required if a
mechanical connection to the gas exists.
1.4 Maintenance
- The servicing and cleaning of the boiler and the
sweeping of the flue gas pipe and the bleed pot must be
done at least once a year by a qualified professional.
- Regularly check the level of water in the system and top
up if required, taking care that cold water is not added
suddenly into the boiler when it is hot.
- We recommend taking out a maintenance contract.
Do not drain the installation, except in cases of
absolute necessity. For example: Several
months' absence with the risk of ice in the
building.
1.5 Adapting to another gas type
Belgium:
The operations required to switch from one gas to another
must be carried out by a SERV'elite technician.
Other countries:
The operations required to switch from one gas to another
must be carried out by your fitter.
4


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for De Dietrich DTG 130-65 Eco.NOx Plus at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of De Dietrich DTG 130-65 Eco.NOx Plus in the language / languages: English as an attachment in your email.

The manual is 1,21 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of De Dietrich DTG 130-65 Eco.NOx Plus

De Dietrich DTG 130-65 Eco.NOx Plus User Manual - German - 20 pages

De Dietrich DTG 130-65 Eco.NOx Plus User Manual - Dutch - 20 pages

De Dietrich DTG 130-65 Eco.NOx Plus User Manual - French - 20 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info