642450
11
Zoom out
Zoom in
Previous page
1/28
Next page
EUWA(*)5~24KBZW1
Packaged air-cooled water chillers
4PW61653-1 – 07.2010
Installation and operation manual
8
Charging water
For all versions
1 Connect the water supply to the drain and fill valve
2 Open the pressure regulating valve (only for EUWAP and
EUWAB) and shut-off valves
3 Use the air purge valves on the unit and purge valves installed in
the highest places in the circuit to remove all air when filling the
system
Only for EUWAP, EUWAB versions
Water must be filled until the system reaches the required
pressure (Pr). The pressure can be read on the manometer.
The value of the required water pressure (Pr) is depending on the
total water volume in the system and the pressure in the expansion
vessel (see previous chapter).
Refer to figure 7 – Required water pressure in function of water
volume and pre-pressure:
1. Calculate the total water volume in the entire system.
2. Check in figure 7 where the horizontal line of the set prepressure
(Pg) cuts the vertical line of the system water volume.
3. At the cutting point, read the required water pressure (Pr) from the
lines in the figure.
Example 1
Total system water volume=130 l
Highest point of circuit above the EUWA=5 m
Pg=(5/10+0.3)=0.8 bar
Pr=±2.0 bar
Example 2
Total system water volume=190 l
Highest point of circuit above the EUWA unit=5 m
Pg=(5/10+0.3)=0.8 bar
Pr=±1.7 bar
PIPING INSULATION
The complete water circuit, inclusive all piping, must be insulated to
prevent condensation and reduction of the cooling capacity.
FIELD WIRING
Parts table
Refer to the wiring diagram supplied with the unit.
Following parts are to be connected during installation:
N ............................Neutral
P.............................Main earth terminal
F1,F2,F3 ................Main fuses (field supply, obligatory)
H3P........................Indication lamp alarm (field supply, not
obligatory)
H5P,H6P.................Indication lamp compr circuit 1, circuit 2 (field
supply, not obligatory)
S7S ........................Switch for cool/heat selection or dual setpoint
selection (field supply, not obligatory)
S9S ........................Switch for remote start/stop selection or dual
setpoint selection (field supply, not obligatory)
E5H........................Field heater (field supply, optional)
X2M (E5H) .............Terminal for field heater connection (optional)
--- ...........................Field wiring
Power circuit and cable requirements
A power circuit must be provided for connection of the unit. This
circuit must be protected with the required safety devices, i.e. a slow
blow fuse on each phase and an earth leak detector. For maximum
cable section (mm
2
) refer to the table.
Connection of the power supply
1 Using the appropriate cable, connect the power circuit to the N,
L1, L2 and L3 terminals of the main switch as shown on the
wiring diagram.
2 Connect the earth conductor (yellow/green) to the earthing
terminal PE.
A Water volume (l)
B Installation height difference (m)
C Pre-pressure
D Factory setting (1.5 bar)
NOTE
In this example it is allowed to keep the pre-pressure
factory setting from 1.5 bar. In this case the initial
water-pressure must be ±2.2 bar
NOTE
In this example it is not allowed to keep the pre-
pressure factory setting from 1.5 bar.
NOTE
A terminal is foreseen in the switchbox on which a
heater (tape) can be connected for preventing the water
piping from freezing during the cold weather months.
Refer to the wiring diagram supplied with the unit.
All field wiring and components must be installed by a
licensed electrician and must comply with relevant Euro-
pean and national regulations.
The field wiring must be carried out in accordance with the
wiring diagram supplied with the unit and the instructions
given below.
Be sure to use a dedicated power circuit. Never use a
power supply shared by another appliance.
Description Legend 5~24 Hp
Powerlines L1, L2, L3, N 10
Main earth cable PE 10
NOTE
Select the power cable in accordance with relevant
local and national regulations.
Switch off the main isolator switch before making any
connections.
For units equipped with freeze protection:
Keep in mind that the heaters are automatically switched
off when the main isolator switch is switched off. For this
reason the main switch should be switched on during the
cold weather months.
4PW61653-1_digital_EN.book Page 8 Thursday, August 26, 2010 1:49 PM
11


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Daikin EUWA water chillers at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Daikin EUWA water chillers in the language / languages: English as an attachment in your email.

The manual is 2,89 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info