642458
17
Zoom out
Zoom in
Previous page
1/20
Next page
English 13
English
Trial Operation and Testing
1. Trial operation and testing
1-1 Measure the supply voltage and make sure that it falls in the specified range.
1-2 Trial operation should be carried out in either cooling or heating mode.
In cooling mode, select the lowest programmable temperature; in heating mode, select the highest programmable
temperature.
1) Trial operation may be disabled in either mode depending on the room temperature.
Use the remote controller for trial operation as described below.
2) After trial operation is complete, set the temperature to a normal level (26°C to 28°C in cooling mode, 20°C to 24°C
in heating mode).
3) For protection, the system disables restart operation for 3 minutes after it is turned off.
1-3 Carry out the test operation in accordance with the operation manual to ensure that all functions and parts,
such as louver movement, are working properly.
The air conditioner requires a small amount of power in its standby mode. If the system is not to be used for some
time after installation, shut off the circuit breaker to eliminate unnecessary power consumption.
If the circuit breaker trips to shut off the power to the air conditioner, the system will restore the original operation
mode when the circuit breaker is opened again.
2. Test items
* If the is not displayed, make sure not to cut the switching
jumper (J8) for cooling operation when cutting the address
jumper.
If it has been cut, replace the remote controller.
Trial operation from remote controller
1) Press “ON/OFF” button to turn on the system.
2) Press “TEMP” button (2 locations) and “MODE” button at the same time.
3) Press “TEMP” button and select “ ”.
4) Press “MODE” button.
5) Trial operation terminates in approx. 30 minutes and switches into normal mode. To quit a trial operation, press
“ON/OFF” button.
Test items
Symptom
(diagnostic display on RC)
Check
Indoor and outdoor units are installed properly on solid bases. Fall, vibration, noise
No refrigerant gas leaks. Incomplete cooling/heating function
Refrigerant gas and liquid pipes and indoor drain hose extension are
thermally insulated.
Water leakage
Draining line is properly installed. Water leakage
System is properly earthed. Electrical leakage
The specified wires are used for inter-unit wiring. Inoperative or burn damage
Indoor or outdoor unit’s air inlet or air outlet has clear path of air. Incomplete cooling/heating function
Stop valves are opened. Incomplete cooling/heating function
Indoor unit properly receives remote control commands. Inoperative
will appear when the MODE button is pressed.*
No heating
Jumper (J8)
17


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Daikin ATXS50K3V1B at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Daikin ATXS50K3V1B in the language / languages: English as an attachment in your email.

The manual is 1,55 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Daikin ATXS50K3V1B

Daikin ATXS50K3V1B User Manual - English - 44 pages

Daikin ATXS50K3V1B User Manual - German - 44 pages

Daikin ATXS50K3V1B Installation Guide - German - 20 pages

Daikin ATXS50K3V1B User Manual - Dutch - 44 pages

Daikin ATXS50K3V1B Installation Guide - Dutch - 20 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info