521993
23
Zoom out
Zoom in
Previous page
1/110
Next page
ComNav Vector G2 & G2B Installation & Operation Installation
Document PN 29010078 V2.0 - 21 -
DRAFT #3 – 29 May 2009
Mounting
The Vector G2 can be mounted on a fixed base, or on a pole; parts for both options are
provided with system kits:
The fixed base option is for mounting the G2 on a flat surface – a cabin roof, a
mounting plate on the mast, and so on.
The pole option is easier to use when there is no location with enough un-obstructed
flat space to accommodate the fixed base (and/or the G2 itself), or when it is desired
to mount the G2 high up above all surfaces.
In either case, make sure that you have enough cable length to route the G2’s interface cable
as far as required into the vessel (see Cables & Extensions on page 26 for more details).
Fixed Base
Figure 4 – Mounting using the Fixed Base
1) Use the fixed base’s four slotted edge-mounting holes (at the four corners of the
base) as a template; position the base so that it is aligned as closely as possible to
the orientation you want. Then mark and drill holes in the flat surface, for the
fasteners (not supplied) which you will be using to fasten the base to that surface.
2) The fixed base has a choice of four tunnels for routing the G2’s power/data along the
mounting surface. Or, you may want to route the cable directly through the surface; if
so, drill a fifth hole – de-burred, & with diameter at least slightly larger than the G2’s
cable – in the surface, approximately where the centre of the fixed base will be.
3) Run the connector end of the G2’s power/data cable through the centre opening in
the fixed base, from the bottom side.
4) Align the keyway in the cable’s plug connector to the key in the G2’s data/power
connector, and then press them together, fully seating the plug. Align, then engage
& rotate the cable connector’s locking ring (clockwise rotation to lock, and
counter-clockwise to un-lock), until you feel a definite “click”.
Figure 5 – Connecting the Power/Data Cable
www.busse-yachtshop.de | info@busse-yachtshop.de
23


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for ComNav Vector G2 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of ComNav Vector G2 in the language / languages: English as an attachment in your email.

The manual is 2,68 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info