816455
43
Zoom out
Zoom in
Previous page
1/47
Next page
8584
MAINTENANCE PLAN
Maintenance works necessary for optimum and trouble-free operation are described in the following sections.
- If an increased wear of parts is revealed by regular inspections, reduce the maintenance intervals!
-Drawupamaintenancelogaereverymaintenance!Thelogassistsinerroranalysis,enablesadjustingthe
intervals to actual usage conditions and validating guarantee claims.
- If you have any queries on maintenance works and intervals: contact manufacturer.
Interval Maintenance work Personnel
Before every commissioning Visual check
- of the entire machine
-ofthetoolholder(angeandbladeholder)
- of the tool (cutting wheel)
- of the control elements (handles, rollers, etc.)
- of the water tank and hoses
- of the cutter head and cutting table
Operating personnel
Visual check
- of the electric system
- of the motor
- of the water pump
Specialist personnel
cleaningthetoolholder(angeandbladeholder) Operating personnel
checking the tool (cutting wheel) for replacement necessity Operating personnel
cutter head and cutting table
- lubrication
- greasing
- oiling
- applying corrosion protection
Operating personnel
Aercompletionofwork Cleaning of
- entire machine
- control elements (handles, rollers, etc.)
- tools (cutting wheel)
- cutter head and cutting table
Operating personnel
draining and cleaning water hoses and tank Operating personnel
Cleaning of
- Motor housing
- Water pump
Specialist personnel
toolholder(angeandbladeholder)
- lubrication
- greasing
- oiling
- applying corrosion protection
Operating personnel
weekly Re-tightening and adjusting
- control elements (handles, rollers, etc.)
- cutter head and cutting table
- threaded joints
Operating personnel
Interval Maintenance work Personnel
yearly Safety inspections of
- electric systems
- motor
Qualiedelectricians
in case of an error Visual check
- of the entire machine
- of the cutter head and cutting table
Operating personnel
Visual check
- water pump
Specialist personnel
re-tightening and adjusting cutter head and cutting table Operating personnel
in case of damage change and replacement
- entire machine
-toolholder(angeandbladeholder)
- tools (diamond blade)
- control elements (handles, locking rollers, etc.)
- water tank and hoses
- cutter head and cutting table
Operating personnel
change and replacement
- electric systems
- motor
- Water pump
Qualiedelectricians
ATTENTION!
Cleaning by a high-pressure cleaner will damage the machine.
Foaming and cleaning with water will damage the machine.
The diamond blade may not be cleaned by metal cleaning tools (scraper, metal sponge or similar), otherwise it will be
damaged.
STEPS AFTER COMPLETING MAINTENANCE
Aercompletionofthemaintenanceworksandbeforeswitchingon,followthefollowingsteps:
1. Check for tightness all threaded joints previously detached.
2. Check the proper installation of all previously removed protective devices and covers.
3. Make sure that all tools, materials and other equipment have been removed from the working zone.
4. Clean the working zone and remove any spilled substances such as liquids, processing materials or similar.
5. Make sure that all safety devices of the system function properly.
43


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Carat P-SERIE at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Carat P-SERIE in the language / languages: English, German, Dutch, Danish, French, Italian, Polish, Swedish, Spanish as an attachment in your email.

The manual is 4.06 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info