XII
3 - 54 Figure 3 - 24 Drum Cleaning
3 - 55 Figure 3 - 25 High Voltage Terminals
3 - 56 Figure 3 - 26 Transfer
3 - 56 Figure 3 - 27 Separation
3 - 57 Figure 3 - 28 Fixing section
3 - 60 Figure 3 - 29 Function Block Diagram (1)
3 - 64 Figure 3 - 30 Function Block Diagram (2)
3 - 67 Figure 3 - 31 Component Block Diagram (1)
3 - 71 Figure 3 - 32 Component Block Diagram (2)
3 - 74 Figure 3 - 33 Transmission
3 - 76 Figure 3 - 34 Reception
3 - 79 Figure 3 - 35 Typical Protocol
3 - 86 Figure 3 - 36 Late Start
3 - 87 Figure 3 - 37 Between-page Sequence
3 - 88 Figure 3 - 38 Mode Change
3 - 89 Figure 3 - 39 Image Transmission Speed Change from the Receiver
3 - 90 Figure 3 - 40 Image Transmission Speed Change from the
Transmitter
3 - 91 Figure 3 - 41 Images
3 - 93 Figure 3 - 42 Encoder and Flow of JBIG Encoding
3 - 94 Figure 3 - 43 Model Templates
3 - 95 Figure 3 - 44 Positions of Pixels in Model Template
3 - 96 Figure 3 - 45 Study Table Study Example 1
3 - 96 Figure 3 - 46 Study Table Study Example 2
3 - 98 Figure 3 - 47 Arithmetic Encoding Conceptual Diagram
3 - 99 Figure 3 - 48 When Predictions are Continually Accurate
3 - 100 Figure 3 - 49 Construction of JBIG Image Data
3 - 100 Figure 3 - 50 BIE Construction Diagram
3 - 101 Figure 3 - 51 BIH Construction Diagram
3 - 103 Figure 3 - 52 BID Construction Diagram
3 - 105 Figure 3 - 53 System Block Diagram
3 - 95 Table 3 - 1 Study Table (Initial values)
3 - 95 Table 3 - 2 Probability Estimation Table
Chapter 4: Maintenance and Service
4 - 8 Figure 4 - 1 Refilling the Stamp Ink 1
4 - 9 Figure 4 - 2 Refilling the Stamp Ink 2
4 - 9 Figure 4 - 3 Refilling the Stamp Ink 3
4 - 12 Figure 4 - 4 Cleaning Location 1
4 - 12 Figure 4 - 5 Cleaning Location 2
4 - 13 Figure 4 - 6 Preparation for Cleaning 1
4 - 13 Figure 4 - 7 Preparation for Cleaning 2
4 - 14 Figure 4 - 8 Cleaning Location 1
4 - 14 Figure 4 - 9 Cleaning Location 2
4 - 15 Figure 4 - 10 Cleaning Location 3
4 - 16 Figure 4 - 11 Preparation for Cleaning
4 - 17 Figure 4 - 12 Cleaning Location
4 - 18 Figure 4 - 13 Preparation for Cleaning 1
4 - 18 Figure 4 - 14 Preparation for Cleaning 2
4 - 19 Figure 4 - 15 Cleaning Location 1