764895
11
Zoom out
Zoom in
Previous page
1/24
Next page
TORONTO SE
Installation: Electrical power requirements
2 Single Phase (live 1, neutral 1, live 2, neutral 2, ground)]
230VAC, 50/60Hz, 2þ, 16A, (Circuit Breaker rating = 20A max each
phase line.)
In 2x16A Service:
Pump 2 (if any) and the Heater are on one service. Everything else is
on the other service.
For 2-Wire connection:
1.Completely remove jumper on J51 and J88.
2.Completely remove jumper on J52 and J62.
3. Make a connection between jumper J60 andJ36
4. Make a connection between jumper J41 and J12
5. Make a connection between jumper J46 and J75
6. Make a connection between jumper J20 and J77
7. Make a connection between jumper J38 and J54
8. Put DIP switches A2, A3 and A5 on ON
B.) 2 Single Phase connection:
3-Phase 5 wires (live 1, live 2, live 3, neutral, ground)]
400VAC, 50/60Hz*, 3þ, 16A, (Circuit Breaker rating = 20A max each
phase line.)
In 3x16A Service:
Pump 2 is on one service.
The Heater is on another service.
Everything else is on the remaining service.
For 3-phase connection:
1.Completely remove jumper on J51 and J88.
2.Completely remove jumper on J52 and J62.
3. Make a connection between jumper J60 andJ45
4. Make a connection between jumper J41 and J79
5. Put DIP switches A2 and A3 on ON and DIP switch A5 on OFF.
C.) 3 - Phase connection (Where available and needed):
Power connections - Continued
IMPORTANT - Service must include a neutral wire, with a line to neutral voltage of 230VAC. *BP systems automatically detect 50Hz vs 60Hz.
NOTE: Excludes ‘Plug & Play’ Spa models.
International cable colour system
For the purpose of standardizing technical requirements, the CENELEC countries (including Austria, Belgium, Czech Republic, Denmark,
Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Luxembourg, Malta, Netherlands, Norway, Portugal, Slovakia, Spain, Sweden,
Switzerland and United Kingdom) have adopted the following colour code:
Systems
1-phase system
3-phase system
Phase (or line)
Brown
Neutral
Blue
Blue
L1
Brown
L2
Black
L3
Grey
Earth
Green / Yellow
Green / Yellow
(11)
11


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Canadian Spa Company Toronto SE at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Canadian Spa Company Toronto SE in the language / languages: English as an attachment in your email.

The manual is 1,67 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info