810636
32
Zoom out
Zoom in
Previous page
1/44
Next page
32
Repair hints
8. Repair hints
8.1 Cracks in the combustion chamber
lining
Cracks in the fire box lining fundamentally do not adversely
aect the function of the fireplace insert. They only need to
be replaced if pieces of the firebox lining have broken o and
the stove body can no longer be protected.
8.2 Damage to paintwork
Only repair paint damage with heat-resistant original paint.
Use spray paint to repair larger areas of damage. Ask your
dealer for Camina & Schmid stove paint.
9. Inspection and maintenance
9.1 Safety inspection
You will obtain optimum, environmentally-friendly heating
results with regular inspection of the fireplace and the
chimney by a technician. The technically correct function
of all safety parts will guarantee your safety. We therefore
recommend an annual inspection by a specialist firm or a
chimney sweep.
9.2 Maintenance
The fireplace needs to be maintained regularly by a specialist
company and/or by a chimney sweep. The ACTUAL condition
of the fireplace needs to be compared with the INTENDED
state. Essentially this is a visual inspection. The results need
to be recorded in writing. Replace or repair faulty parts
immediately.
9.3 Maintenance information
NOTICE
Please refer to the additional maintenance instructions in
the separate instructions for the fireplace components,
such as heat storage vessel, diaphragm expansion vessel,
water pump!
Only top up with treated water!
9.3.1 In the event of malfunctions, faults
Shut down the fireplace in the event of problems or faults –
such as decreasing heat output, decreasing draught, escape
of smoke and/or water. Arrange for the cause to be rectified
immediately by a technician.
9.3.2 After operating breaks
After all breaks in operation and longer pauses, check the
heating and exhaust paths, specifically the chimney for
blockages and remove blockages before starting up the
fireplace again. Check the entire fireplace for faults!
9.3.3 At the start of the heating period
Check and fill all hydronic lines of the fireplace using
separate instructions or with the help of a technician and set
the temperature and pressure setpoints. Check that all the
safety devices and displays (e.g. thermal discharge safety
device, safety valve, thermometer) are all working properly.
Make sure that all the flue gas paths are clear. Arrange for a
technician to rectify any faults or defects.
9.3.4 Annual maintenance of the hot water
boiler
Arrange for a technician to check the hot water boiler, flue
gas paths and flue gas pipes annually or in the event of
heavier loading (frequent heating, incomplete combustion of
the heating gases) more often and also after the chimney has
been cleaned.
Repair or clean any deposits, functional faults and defects.
9.3.5 Maintenance of the safety devices in
the water circuit
Check the thermal discharge safety device at least once a
year for correct working order. To do so, press the red button
on the valve. This may be a little sluggish. Use a large flat aid
to help you with this.
32


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Camina-Schmid Lina-W at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Camina-Schmid Lina-W in the language / languages: English as an attachment in your email.

The manual is 3.69 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Camina-Schmid Lina-W

Camina-Schmid Lina-W User Manual - German - 44 pages

Camina-Schmid Lina-W User Manual - Dutch - 44 pages

Camina-Schmid Lina-W User Manual - French - 16 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info