636469
32
Zoom out
Zoom in
Previous page
1/68
Next page
6720818454 (2016/02) US SSB
32 | Installation
Fig. 40 Vertical venting system (sealed combustion)
Fig. 41 Vertical venting system (sealed combustion)
4.7.6 Multiple boiler
When installing multiple air and vent terminations, be sure that:
The clearance between the vent and air termination are in accordance
with the gures shown in this chapter
All vent pipes and air inlet must terminate at the same height
Fig. 42 Concentric vent and combustion air vertical termination; X ≥ 12”
; Y ≥ 12” (18” for Canada and/or per CAN/CSA B149.1) above
highest snow level. Maximum 24” above roof
Fig. 43 Concentric vent and combustion air horizontal termination;
X ≥ 1” min or 2”max; Y ≥ 24”; Note: the level of the termination
must be the same at 12” min from grade or snow line
Fig. 44 Multiple air and vent vertical termination; X ≥ 12”; Y≥ 12”
2 1
2 1
Flexible vent and
combustion air pipe
X
Y
Y
X
Vent
Combustion
air intake
Air intake
Air intake
Vent
X
Y
Vent
32


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Buderus SSB512 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Buderus SSB512 in the language / languages: English as an attachment in your email.

The manual is 9,92 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Buderus SSB512

Buderus SSB512 Installation Guide - French - 68 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info