636469
29
Zoom out
Zoom in
Previous page
1/68
Next page
SSB 6720818454 (2016/02) US
Installation | 29
4.7.5 Approved examples of horizontal and vertical venting
installation
Place pipe supports every 5 feet (1,525 mm) of horizontal
and vertical run, beginning with support near boiler.
The condensate must be disposed of in accordance with applicable rules.
Periodic cleaning of the vent terminal and air-intake screens is
mandatory.
Avoid locating vent terminals near equipment or building features
which can be subject to degradation from exhaust gases.
If multiple boilers are installed in a row, allow at least 1 foot (305 mm)
clearance between the vent termination of one and the combustion air
intake of the other.
In the following gures (Fig. 29 to Fig. 41), the combustion air intake pipe
is indicated with the number 1 (one) and the exhaust vent pipe with the
number 2 (two)
Fig. 29 Horizontal venting system (room air only)
Fig. 30 Horizontal venting system (room air only); X≥4” (102 mm)
Fig. 31 Vertical venting system (room air only); X > 12” (305 mm); Y 12”
above maximum snow level or at least 24” whichever is greater
2
2
1
X
2
1
2
Y
X
2
1
29


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Buderus SSB512 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Buderus SSB512 in the language / languages: English as an attachment in your email.

The manual is 9,92 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

Others manual(s) of Buderus SSB512

Buderus SSB512 Installation Guide - French - 68 pages


The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info