637127
28
Zoom out
Zoom in
Previous page
1/64
Next page
7 Mise en service
Logano plus GB102 – 6720816954 (2016/03)
28
7.7 Liste de contrôle mise en service
Après la mise en service, confirmer les travaux, noter les valeurs,
signer et dater.
Mise en service
Page Unité Valeur Commentaires
1 Remplir l'installation de chauffage et vérifier l'absence de
fuites
2 Enregistrer les valeurs du gaz
Indice de Wobbe
Pouvoir calorifique supérieur
kWh/m
3
3 Chercher d'éventuelles fuites de gaz sur l'alimentation en
gaz
Purger l'alimentation en gaz
4 Pressuriser le système de chauffage et enregistrer la valeur bar
5 Vérifier les conduites d'alimentation/extraction et les
raccordements des conduites d'évacuation des fumées
6 Vérifier que l'installation est complète
7 Régler le type de gaz, si nécessaire (non applicable à la
Belgique)
8 Mettre en service le brûleur et les commandes
9 Mesurer et enregistrer la pression de raccordement du gaz mbar
10 Mesurer les valeurs des fumées pleine
charge
pleine
charge
- Pression des fumées Pa
- Température des fumées (brute) t
A
°C
- Température ambiante t
L
°C
- Température des fumées (nette) t
A
- t
L
°C
- Teneur en oxygène ou dioxyde de carbone Vol. %
- Pertes de fumées q
A
%
- Teneur en CO (sans air) ppm
- Teneur en oxygène ou dioxyde de carbone de l'arrivée
d'air frais dans une chambre étanche
Vol. %
11 Chercher d'éventuelles fuites lors du fonctionnement
12 Tests fonctionnels
Mesurer le courant d'ionisation
13 Montage des panneaux d'habillage
14 Instruire l'opérateur et remettre la documentation
15 Installation correcte par un installateur agréé Signature
16 Opérateur Signature
Tab. 15 Liste de contrôle mise en service
28


Need help? Post your question in this forum.

Forumrules


Report abuse

Libble takes abuse of its services very seriously. We're committed to dealing with such abuse according to the laws in your country of residence. When you submit a report, we'll investigate it and take the appropriate action. We'll get back to you only if we require additional details or have more information to share.

Product:

For example, Anti-Semitic content, racist content, or material that could result in a violent physical act.

For example, a credit card number, a personal identification number, or an unlisted home address. Note that email addresses and full names are not considered private information.

Forumrules

To achieve meaningful questions, we apply the following rules:

Register

Register getting emails for Buderus Logano plus GB102 16-30-42 at:


You will receive an email to register for one or both of the options.


Get your user manual by e-mail

Enter your email address to receive the manual of Buderus Logano plus GB102 16-30-42 in the language / languages: French as an attachment in your email.

The manual is 12,43 mb in size.

 

You will receive the manual in your email within minutes. If you have not received an email, then probably have entered the wrong email address or your mailbox is too full. In addition, it may be that your ISP may have a maximum size for emails to receive.

The manual is sent by email. Check your email

If you have not received an email with the manual within fifteen minutes, it may be that you have a entered a wrong email address or that your ISP has set a maximum size to receive email that is smaller than the size of the manual.

The email address you have provided is not correct.

Please check the email address and correct it.

Your question is posted on this page

Would you like to receive an email when new answers and questions are posted? Please enter your email address.



Info